A platform for research: civil engineering, architecture and urbanism
Special problems of hingeless arch erection
Fabrication and construction of hingeless steel arch, 800 ft span, of Henry Hudson Bridge in New York City; unusual fabrication accuracy and careful crown jacking required to induce proper stress conditions in finished structure; falsework cage weighing 140 tons lowered to river bottom by derrick boat; steel H-piles driven through this cage to support bents; crown closure details; deck construction.
Special problems of hingeless arch erection
Fabrication and construction of hingeless steel arch, 800 ft span, of Henry Hudson Bridge in New York City; unusual fabrication accuracy and careful crown jacking required to induce proper stress conditions in finished structure; falsework cage weighing 140 tons lowered to river bottom by derrick boat; steel H-piles driven through this cage to support bents; crown closure details; deck construction.
Special problems of hingeless arch erection
Eng News-Rec
Greene, W.K. (author)
Engineering News-Record ; 117
1936
5 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1938
|Engineering Index Backfile | 1938
|Jacking devices control rib stresses during erection and closing of 800-ft. hingeless arch
Engineering Index Backfile | 1936
Calculation of hingeless stiffened jointed arch
Engineering Index Backfile | 1942
|The design of a symmetrical hingeless arch
Engineering Index Backfile | 1926
|