A platform for research: civil engineering, architecture and urbanism
Nailed timber centering for concrete-arch bridges in Russia
Construction of nailed timber centering for erection of reinforced-concrete arches, up to 262-5 ft in span, of highway bridge over Angara River near Irkutsk, Siberia; box units of boards and timbers assembled into arches with three concrete hinges for spans up to 135 ft carry loads of 8700 lb per ft; method of striking centering on crib in center of concrete-arch span; principles of design. (See also correction, by R. S. SOULE, JR., in v 117 n 6 Aug 6 p 203)
Nailed timber centering for concrete-arch bridges in Russia
Construction of nailed timber centering for erection of reinforced-concrete arches, up to 262-5 ft in span, of highway bridge over Angara River near Irkutsk, Siberia; box units of boards and timbers assembled into arches with three concrete hinges for spans up to 135 ft carry loads of 8700 lb per ft; method of striking centering on crib in center of concrete-arch span; principles of design. (See also correction, by R. S. SOULE, JR., in v 117 n 6 Aug 6 p 203)
Nailed timber centering for concrete-arch bridges in Russia
Eng News-Rec
Chlebnikov, E.L. (author)
Engineering News-Record ; 116
1936
2 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Nailed timber trusses for bridges
Engineering Index Backfile | 1954
|Long-span timber arch centering
Engineering Index Backfile | 1938
|Long-span timber arch centering
Engineering Index Backfile | 1938
|Timber trusses for arch centering
Engineering Index Backfile | 1954