A platform for research: civil engineering, architecture and urbanism
Economy of cellular steel sheet piling breakwater construction in United States; construction of Calumet breakwater, 5025 ft long, and of Fairport breakwater, 500 ft long.
Economy of cellular steel sheet piling breakwater construction in United States; construction of Calumet breakwater, 5025 ft long, and of Fairport breakwater, 500 ft long.
Development of steel breakwaters
Military Engr
Heavey, W.P. (author)
Military Engineer ; 27
1935
6 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Developments in steel breakwaters
Engineering Index Backfile | 1934
|Engineering Index Backfile | 1928
|Engineering Index Backfile | 1943
|HENRY – Federal Waterways Engineering and Research Institute (BAW) | 2008
|Engineering Index Backfile | 1943
|