A platform for research: civil engineering, architecture and urbanism
Equipment and methods used in excavation, grading and reclamation of swamps for construction of 260-acre flying field and seaplane base at Singapore.
Equipment and methods used in excavation, grading and reclamation of swamps for construction of 260-acre flying field and seaplane base at Singapore.
Building airport in Singapore
Excavating Engr
Friend, J.F. (author)
Excavating Engineer ; 30
1936
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1939
|Engineering Index Backfile | 1939
|Engineering Index Backfile | 1939
|Engineering Index Backfile | 1939
|Airport Development in Singapore
British Library Conference Proceedings | 1997
|