A platform for research: civil engineering, architecture and urbanism
This tunnel licked wide-load problem
Installation of gauntlet track; difficulties in drainage were eliminated by placing cross flume at tunnel portal leading to settling basin; 39-ft track panels were assembled outside tunnel with replacement of existing panels in tunnel; installation of scanner for stopping trains with out-size load.
This tunnel licked wide-load problem
Installation of gauntlet track; difficulties in drainage were eliminated by placing cross flume at tunnel portal leading to settling basin; 39-ft track panels were assembled outside tunnel with replacement of existing panels in tunnel; installation of scanner for stopping trains with out-size load.
This tunnel licked wide-load problem
Ry Age
Railway Age ; 161
1966
3 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Hollywood licked infiltration -- Before it licked Hollywood (Fla)
Engineering Index Backfile | 1961
|How rains, cold weather, poor soil conditions were licked at Gustavus
Engineering Index Backfile | 1945
|Safety in tunnel covers wide field
Engineering Index Backfile | 1947