New 120 ton cutterhead tunneling machine is equipped with 6.72 m diam 5.40 m long shield driven by 24 hydraulic jacks exerting pressure up to 2400 tons; mucking operations as well as forwarding and installation of 5 m long reinforced concrete lining sections weighing 3.3 tons each are fully mechanized; with cutterhead making 7 rpm, shield advances at rate of 5 mm/revolution.
Construction of north-south subway line in Munich
New 120 ton cutterhead tunneling machine is equipped with 6.72 m diam 5.40 m long shield driven by 24 hydraulic jacks exerting pressure up to 2400 tons; mucking operations as well as forwarding and installation of 5 m long reinforced concrete lining sections weighing 3.3 tons each are fully mechanized; with cutterhead making 7 rpm, shield advances at rate of 5 mm/revolution.
Construction of north-south subway line in Munich
Bau der Muenchner Nord-Sued-U-Bahn-Linie
Schupp, R. (author)
Bauingenieur ; 42
1967
3 pages
Article (Journal)
German
© Metadata Copyright Elsevier B. V. All rights reserved.
TIBKAT | 1997
|British Library Online Contents | 2005
|Engineering Index Backfile | 1936
|Subway construction in Munich, developments in tunnelling with shotcrete support
Online Contents | 1987
|Subway construction in Munich, developments in tunnelling with shotcrete support
Springer Verlag | 1987
|