A platform for research: civil engineering, architecture and urbanism
Calibrated building energy simulation and its application in a high-rise commercial building in Shanghai
AbstractThe method of calibrated computer simulation is summarized on the basis of related literatures and guidelines. It is used to analyze the energy performance of a high-rise commercial building in Shanghai, China. DOE-2 energy model is built up with the detailed data of building and system that are collected on as-built drawings, specifications, operating records and site surveys. Model calibration is conducted on the comparison between simulation output and measured energy use. Energy model is adjusted until statistics indices are met in compliance to applicable standards and guidelines. Calibrated model is used in the performance analysis for energy conservation measures (ECMs) that are about to be implemented in the retrofitting project of the high-rise, including using variable speed chilled water pumps instead of constant variable speed ones, using free cooling during winter and mild seasons, decreasing lighting power densities. Energy saving performance is simulated and calculated to find out which ECM is the best option for the building.
Calibrated building energy simulation and its application in a high-rise commercial building in Shanghai
AbstractThe method of calibrated computer simulation is summarized on the basis of related literatures and guidelines. It is used to analyze the energy performance of a high-rise commercial building in Shanghai, China. DOE-2 energy model is built up with the detailed data of building and system that are collected on as-built drawings, specifications, operating records and site surveys. Model calibration is conducted on the comparison between simulation output and measured energy use. Energy model is adjusted until statistics indices are met in compliance to applicable standards and guidelines. Calibrated model is used in the performance analysis for energy conservation measures (ECMs) that are about to be implemented in the retrofitting project of the high-rise, including using variable speed chilled water pumps instead of constant variable speed ones, using free cooling during winter and mild seasons, decreasing lighting power densities. Energy saving performance is simulated and calculated to find out which ECM is the best option for the building.
Calibrated building energy simulation and its application in a high-rise commercial building in Shanghai
Pan, Yiqun (author) / Huang, Zhizhong (author) / Wu, Gang (author)
Energy and Buildings ; 39 ; 651-657
2006-09-23
7 pages
Article (Journal)
Electronic Resource
English
Shanghai New Century Commercial Building Design of Super Large-scale High-rise Department Store
British Library Online Contents | 1996
|Multifunctional window for high-rise commercial building
European Patent Office | 2021
|Dynamic building performance assessment using calibrated simulation
Online Contents | 2016
|Dynamic building performance assessment using calibrated simulation
Elsevier | 2016
|