A platform for research: civil engineering, architecture and urbanism
Optimizing hydropower dam location and removal in the São Francisco river basin, Brazil to balance hydropower and river biodiversity tradeoffs
Highlights A model is developed to optimize the location and removal of large hydropower dams. Impacts on river connectivity and migratory fish species richness are considered. The model is applied to the São Francisco River basin, Brazil. Important tradeoffs between hydropower and fish species richness are observed.
Abstract To support eco-friendly hydropower planning in developing regions, we propose a spatial optimization model for locating dams to balance tradeoffs between hydropower generation and migratory fish species richness. Our model incorporates two special features. First, it is tailored to the dispersal of tropical migratory fishes, which typically require long, unimpeded river stretches to complete their life-cycle. To model fish with this type of dispersal pattern, we introduce the concept of a river pathway, which represents a novel way to describe river connectivity. Second, it combines decisions about dam placement and removal, thus facilitating opportunities for hydropower offsetting. We apply our model to the São Francisco River basin, Brazil, an area of hydropower-freshwater biodiversity conflict. We find that dams have reduced weighted migratory fish richness 51% compared to a pre-dam baseline. We also find that even limited dam removal has the potential to significantly enhance fish biodiversity. Offsetting the removal of a single dam by the optimal siting of new dams could increase fish richness by 25% above the current average. Moving forward, optimizing new dam sites to increase hydropower by 20%, rather than selecting the fewest number of dams, could reduce fish species losses by 89%. If decisions about locating new dams are combined with dam removal, then a win-win can even be achieved with 20% greater hydropower and 19% higher species richness. Regardless of hydropower targets and dam removal options, a key observation is that optimal sites for dams are mostly located in the upper reaches of the basin rather than along the main stem of the São Francisco River or its main tributaries.
Optimizing hydropower dam location and removal in the São Francisco river basin, Brazil to balance hydropower and river biodiversity tradeoffs
Highlights A model is developed to optimize the location and removal of large hydropower dams. Impacts on river connectivity and migratory fish species richness are considered. The model is applied to the São Francisco River basin, Brazil. Important tradeoffs between hydropower and fish species richness are observed.
Abstract To support eco-friendly hydropower planning in developing regions, we propose a spatial optimization model for locating dams to balance tradeoffs between hydropower generation and migratory fish species richness. Our model incorporates two special features. First, it is tailored to the dispersal of tropical migratory fishes, which typically require long, unimpeded river stretches to complete their life-cycle. To model fish with this type of dispersal pattern, we introduce the concept of a river pathway, which represents a novel way to describe river connectivity. Second, it combines decisions about dam placement and removal, thus facilitating opportunities for hydropower offsetting. We apply our model to the São Francisco River basin, Brazil, an area of hydropower-freshwater biodiversity conflict. We find that dams have reduced weighted migratory fish richness 51% compared to a pre-dam baseline. We also find that even limited dam removal has the potential to significantly enhance fish biodiversity. Offsetting the removal of a single dam by the optimal siting of new dams could increase fish richness by 25% above the current average. Moving forward, optimizing new dam sites to increase hydropower by 20%, rather than selecting the fewest number of dams, could reduce fish species losses by 89%. If decisions about locating new dams are combined with dam removal, then a win-win can even be achieved with 20% greater hydropower and 19% higher species richness. Regardless of hydropower targets and dam removal options, a key observation is that optimal sites for dams are mostly located in the upper reaches of the basin rather than along the main stem of the São Francisco River or its main tributaries.
Optimizing hydropower dam location and removal in the São Francisco river basin, Brazil to balance hydropower and river biodiversity tradeoffs
O'Hanley, Jesse R. (author) / Pompeu, Paulo S. (author) / Louzada, Marina (author) / Zambaldi, Ludimilla P. (author) / Kemp, Paul S. (author)
2019-11-28
Article (Journal)
Electronic Resource
English
Managing Sediment in the Mekong River Basin: Tradeoffs between Hydropower and the Environment
British Library Conference Proceedings | 2013
|British Library Online Contents | 2015
|