A platform for research: civil engineering, architecture and urbanism
Fail-safe optimum cable system under cable breakage in cable-stayed bridges. Application to the Queensferry Crossing Bridge
Abstract This paper presents a methodology to optimize the cable system in cable-stayed bridges, whose main novelty is to take into account the accidental breakage of one cable within the design process. To this end, a multi-model optimization strategy is proposed by establishing design constraints on both the intact and damaged models. The dynamic effect of cable breakage is accounted for in the damaged models by the application of impact loads at the tower and deck anchorages. The objective function is to minimize the steel volume in the cable system by varying the cable anchor positions on the deck, the number of cables, the cross sectional areas and prestressing forces. This approach is applied to the Queensferry Crossing Bridge, the longest three-tower cable-stayed bridge in the world and also the largest with crossing cables in the central spans. The fail-safe optimization of the cable system leads to a different layout than the optimum design without considering cable breakage, with more cables and smaller areas, having a minimum penalty in steel volume.
Highlights A method to optimize the cable system in cable-stayed bridges under cable breakage. Design constraints on the intact and damaged models are considered simultaneously. The dynamic effect of cable breakage is accounted for in the damaged models. Different layout with more cables and smaller areas with minimum penalty weight.
Fail-safe optimum cable system under cable breakage in cable-stayed bridges. Application to the Queensferry Crossing Bridge
Abstract This paper presents a methodology to optimize the cable system in cable-stayed bridges, whose main novelty is to take into account the accidental breakage of one cable within the design process. To this end, a multi-model optimization strategy is proposed by establishing design constraints on both the intact and damaged models. The dynamic effect of cable breakage is accounted for in the damaged models by the application of impact loads at the tower and deck anchorages. The objective function is to minimize the steel volume in the cable system by varying the cable anchor positions on the deck, the number of cables, the cross sectional areas and prestressing forces. This approach is applied to the Queensferry Crossing Bridge, the longest three-tower cable-stayed bridge in the world and also the largest with crossing cables in the central spans. The fail-safe optimization of the cable system leads to a different layout than the optimum design without considering cable breakage, with more cables and smaller areas, having a minimum penalty in steel volume.
Highlights A method to optimize the cable system in cable-stayed bridges under cable breakage. Design constraints on the intact and damaged models are considered simultaneously. The dynamic effect of cable breakage is accounted for in the damaged models. Different layout with more cables and smaller areas with minimum penalty weight.
Fail-safe optimum cable system under cable breakage in cable-stayed bridges. Application to the Queensferry Crossing Bridge
Soto, Noel (author) / Cid, Clara (author) / Baldomir, Aitor (author) / Hernández, Santiago (author)
Engineering Structures ; 279
2022-12-27
Article (Journal)
Electronic Resource
English
16.13: Queensferry crossing cable‐stayed composite bridge
Wiley | 2017
|Optimum Cable-Force Adjustments in Concrete Cable-Stayed Bridges
British Library Online Contents | 1995
|Optimum Cable-Force Adjustments in Concrete Cable-Stayed Bridges
Online Contents | 1995
|Optimum design of cable-stayed bridges
Online Contents | 2012
|Optimum design of cable-stayed bridges
British Library Online Contents | 1999
|