A platform for research: civil engineering, architecture and urbanism
Analysis of jacking forces during microtunnelling in limestone
AbstractThis paper is intended to describe an Italian case study of a microtunnelling project where the boring machine got stuck during jacking of a 760mm pipe in a limestone formation. Reference is made to rock mass characterisation, including site investigations and laboratory tests. The machine’s performance is compared to prediction. To allow for a better understanding of the conditions which led to the unexpectedly high jacking forces, continuum and discontinuum numerical analyses have been used. These analyses are shown to be essential at the design stage, when dealing with microtunnelling in a rock mass, in order to obtain a good prediction of the jacking forces.
Analysis of jacking forces during microtunnelling in limestone
AbstractThis paper is intended to describe an Italian case study of a microtunnelling project where the boring machine got stuck during jacking of a 760mm pipe in a limestone formation. Reference is made to rock mass characterisation, including site investigations and laboratory tests. The machine’s performance is compared to prediction. To allow for a better understanding of the conditions which led to the unexpectedly high jacking forces, continuum and discontinuum numerical analyses have been used. These analyses are shown to be essential at the design stage, when dealing with microtunnelling in a rock mass, in order to obtain a good prediction of the jacking forces.
Analysis of jacking forces during microtunnelling in limestone
Barla, Marco (author) / Camusso, Marco (author) / Aiassa, Santina (author)
Tunnelling and Underground Space Technology ; 21 ; 668-683
2006-01-01
16 pages
Article (Journal)
Electronic Resource
English
Analysis of jacking forces during microtunnelling in limestone
Online Contents | 2006
|Analysis of jacking forces during microtunnelling in limestone
British Library Online Contents | 2006
|Prediction of jacking forces for microtunnelling operations
Online Contents | 1999
|Prediction of jacking forces for microtunnelling operations
British Library Online Contents | 1999
|Pipe Jacking and Microtunnelling
British Library Online Contents | 1995
|