A platform for research: civil engineering, architecture and urbanism
Tunnelling of the Swedish undersea repository for low and intermediate reactor waste
AbstractA final repository for waste from the operation of Swedish nuclear power plants is currently being built in the vicinity of Forsmark Nuclear Power Station on the eastern coast of Sweden. The repository is sited under the sea with a rock cover of about 60 m from the top of the rock caverns to the seabed. The underground complex consists of two access tunnels, communication tunnels, rock chambers and silos. The total quantity of rock excavated in the first construction phase amounts to 430 000 m3 the overall length of tunnels, rock chambers, silos and shafts is 4500 m. This paper focuses on the tunnelling of the access tunnels, which pass through a regional fault. In addition, a brief description is given of the excavation of the 69-m-high silo.
RésuméUn dépot permanent pour les déchets provenent du fonctionnement des centrales nucléaires suèdoises est en cours de construction près de la station nucléaire de Forsmark sur la côte est en Suède. Le dépot est situé sous la mer avec une couverture rocheuse d'à peu près 60 m entre le fond de la mer et le haut de la caverne. Le complexe sous-terrain consiste de deux tunnels d'accès, de tunnels de communication, de chambres rocheuses et de silos. La quantité totale de roche excavée pendant la première phase de la construction se monte à 430 000 m et la longueur totale des tunnels, des chambres rocheuses, des silos et des puits d'accès est de 4500 m. Cet article se concentre sur les techniques tunnelières des tunnels d'accès qui passe à travers une faille locale. On donne aussi une description rapide de l'excavation du silo qui fait 69 m de hauteur.
Tunnelling of the Swedish undersea repository for low and intermediate reactor waste
AbstractA final repository for waste from the operation of Swedish nuclear power plants is currently being built in the vicinity of Forsmark Nuclear Power Station on the eastern coast of Sweden. The repository is sited under the sea with a rock cover of about 60 m from the top of the rock caverns to the seabed. The underground complex consists of two access tunnels, communication tunnels, rock chambers and silos. The total quantity of rock excavated in the first construction phase amounts to 430 000 m3 the overall length of tunnels, rock chambers, silos and shafts is 4500 m. This paper focuses on the tunnelling of the access tunnels, which pass through a regional fault. In addition, a brief description is given of the excavation of the 69-m-high silo.
RésuméUn dépot permanent pour les déchets provenent du fonctionnement des centrales nucléaires suèdoises est en cours de construction près de la station nucléaire de Forsmark sur la côte est en Suède. Le dépot est situé sous la mer avec une couverture rocheuse d'à peu près 60 m entre le fond de la mer et le haut de la caverne. Le complexe sous-terrain consiste de deux tunnels d'accès, de tunnels de communication, de chambres rocheuses et de silos. La quantité totale de roche excavée pendant la première phase de la construction se monte à 430 000 m et la longueur totale des tunnels, des chambres rocheuses, des silos et des puits d'accès est de 4500 m. Cet article se concentre sur les techniques tunnelières des tunnels d'accès qui passe à travers une faille locale. On donne aussi une description rapide de l'excavation du silo qui fait 69 m de hauteur.
Tunnelling of the Swedish undersea repository for low and intermediate reactor waste
Carlsson, Anders (author) / Hedman, Tommy (author)
Tunnelling and Underground Space Technology ; 1 ; 243-250
1986-01-01
8 pages
Article (Journal)
Electronic Resource
English
Tunnelling Machine Development for Undersea Projects
British Library Conference Proceedings | 1993
|Large Undersea Tunnels and the Progress of Tunnelling Technology
Online Contents | 1994
|Large undersea tunnels and the progress of tunnelling technology
Elsevier | 1994
|Large Undersea Tunnels and the Progress of Tunnelling Technology
British Library Conference Proceedings | 1994
|Large Undersea Tunnels and the Progress of Tunnelling Technology
British Library Online Contents | 1994
|