A platform for research: civil engineering, architecture and urbanism
Long-term thermal imbalance in large borehole heat exchangers array – A numerical study based on the Leicester project
Highlights Numerical simulation of real borehole heat exchanger array project in Leicester, UK. Thermal imbalance, load shifting and thermal recharge observed and quantified. Linear relationship between accumulated heat and the working fluid temperature rise. Limitation factors of the annual thermal load imbalance are investigated.
Abstract When a Borehole Heat Exchanger (BHE) array is coupled with heat pump to provide cooling and heating to the buildings, thermal interaction between BHEs may occur in the subsurface. In the long term, imbalanced seasonal thermal load may lead to low or high temperature zones accumulating in the centre of the array. In this study, numerical models are configured according to a real BHE array project in Leicester, UK, and verified against monitoring data. Based on this reference model, a series of numerical experiments are conducted to investigate the response of circulation fluid temperature to different settings of imbalanced thermal load. It is found that over long-term operation, the sub array with a larger number of installed BHEs is shifting its thermal load towards the other branch with less BHEs installed. Within each sub array, the heat injection rate on the central BHEs is gradually shifted towards those located at the edge. A linear correlation is also found between the working fluid temperature increment and the amount of the accumulated heat injected into the subsurface.
Long-term thermal imbalance in large borehole heat exchangers array – A numerical study based on the Leicester project
Highlights Numerical simulation of real borehole heat exchanger array project in Leicester, UK. Thermal imbalance, load shifting and thermal recharge observed and quantified. Linear relationship between accumulated heat and the working fluid temperature rise. Limitation factors of the annual thermal load imbalance are investigated.
Abstract When a Borehole Heat Exchanger (BHE) array is coupled with heat pump to provide cooling and heating to the buildings, thermal interaction between BHEs may occur in the subsurface. In the long term, imbalanced seasonal thermal load may lead to low or high temperature zones accumulating in the centre of the array. In this study, numerical models are configured according to a real BHE array project in Leicester, UK, and verified against monitoring data. Based on this reference model, a series of numerical experiments are conducted to investigate the response of circulation fluid temperature to different settings of imbalanced thermal load. It is found that over long-term operation, the sub array with a larger number of installed BHEs is shifting its thermal load towards the other branch with less BHEs installed. Within each sub array, the heat injection rate on the central BHEs is gradually shifted towards those located at the edge. A linear correlation is also found between the working fluid temperature increment and the amount of the accumulated heat injected into the subsurface.
Long-term thermal imbalance in large borehole heat exchangers array – A numerical study based on the Leicester project
Chen, Shuang (author) / Cai, Wanlong (author) / Witte, Francesco (author) / Wang, Xuerui (author) / Wang, Fenghao (author) / Kolditz, Olaf (author) / Shao, Haibing (author)
Energy and Buildings ; 231
2020-09-26
Article (Journal)
Electronic Resource
English
Thermal response testing of compromised borehole heat exchangers
Oxford University Press | 2013
|Thermal capacity effects in borehole ground heat exchangers
Elsevier | 2013
|Thermal capacity effects in borehole ground heat exchangers
Online Contents | 2013
|