Multiobjective design of Work-In-Process buffer for scheduling repetitive building projects
AbstractVariability in production is one of the largest factors that negatively impacts construction project performance. A common construction practice to protect production systems from variability is the use of buffers (Bf). Construction practitioners and researchers have proposed buffering approaches for different production situations, but these approaches have faced practical limitations in their application. A multiobjective analytic model (MAM) is proposed to develop a graphical solution for the design of Work-In-Process (WIP) Bf in order to overcome these practical limitations to Bf application, being demonstrated through the scheduling of repetitive building projects. Multiobjective analytic modeling is based on Simulation–Optimization (SO) modeling and Pareto Fronts concepts. Simulation–Optimization framework uses Evolutionary Strategies (ES) as the optimization search approach, which allows for the design of optimum WIP Bf sizes by optimizing different project objectives (e.g., project cost, time and productivity). The framework is tested and validated on two repetitive building projects. The SO framework is then generalized through Pareto Front concepts, allowing for the development of the MAM as nomographs for practical use. The application advantages of the MAM are shown through a project scheduling example. Results demonstrate project performance improvements and a more efficient and practical design of WIP Bf. Additionally, production strategies based on WIP Bf and lean production principles in construction are discussed.
Multiobjective design of Work-In-Process buffer for scheduling repetitive building projects
AbstractVariability in production is one of the largest factors that negatively impacts construction project performance. A common construction practice to protect production systems from variability is the use of buffers (Bf). Construction practitioners and researchers have proposed buffering approaches for different production situations, but these approaches have faced practical limitations in their application. A multiobjective analytic model (MAM) is proposed to develop a graphical solution for the design of Work-In-Process (WIP) Bf in order to overcome these practical limitations to Bf application, being demonstrated through the scheduling of repetitive building projects. Multiobjective analytic modeling is based on Simulation–Optimization (SO) modeling and Pareto Fronts concepts. Simulation–Optimization framework uses Evolutionary Strategies (ES) as the optimization search approach, which allows for the design of optimum WIP Bf sizes by optimizing different project objectives (e.g., project cost, time and productivity). The framework is tested and validated on two repetitive building projects. The SO framework is then generalized through Pareto Front concepts, allowing for the development of the MAM as nomographs for practical use. The application advantages of the MAM are shown through a project scheduling example. Results demonstrate project performance improvements and a more efficient and practical design of WIP Bf. Additionally, production strategies based on WIP Bf and lean production principles in construction are discussed.
Multiobjective design of Work-In-Process buffer for scheduling repetitive building projects
González, V. (author) / Alarcón, L.F. (author) / Molenaar, K. (author)
Automation in Construction ; 18 ; 95-108
2008-05-20
14 pages
Article (Journal)
Electronic Resource
English
Multiobjective design of Work-In-Process buffer for scheduling repetitive building projects
Online Contents | 2009
|Multiobjective design of Work-In-Process buffer for scheduling repetitive building projects
Online Contents | 2009
|Multiobjective design of Work-In-Process buffer for scheduling repetitive building projects
British Library Online Contents | 2009
|Multiobjective Linear Programming Model for Scheduling Linear Repetitive Projects
Online Contents | 2007
|Multiobjective Linear Programming Model for Scheduling Linear Repetitive Projects
British Library Online Contents | 2007
|