A platform for research: civil engineering, architecture and urbanism
Enhanced flexible riser installation — extending towed production system technologies
AbstractIntegration of flexible risers within the Towed Production System (TPS) installation technique is described. Installation by Controlled Depth Tow Methods (CDTM) offers cost savings and enhancement to overall system availability by controlling the depth of a Catenary Anchor Leg Mooring (CALM) buoy. This novel application with CALM buoys utilises the flexibility of composite risers, whilst providing an innovative solution for export systems exposed to extreme environmental conditions.
Enhanced flexible riser installation — extending towed production system technologies
AbstractIntegration of flexible risers within the Towed Production System (TPS) installation technique is described. Installation by Controlled Depth Tow Methods (CDTM) offers cost savings and enhancement to overall system availability by controlling the depth of a Catenary Anchor Leg Mooring (CALM) buoy. This novel application with CALM buoys utilises the flexibility of composite risers, whilst providing an innovative solution for export systems exposed to extreme environmental conditions.
Enhanced flexible riser installation — extending towed production system technologies
Headworth, C. (author) / Aylwin, E. (author) / Smith, M. (author)
Marine Structures ; 5 ; 455-464
1992-01-01
10 pages
Article (Journal)
Electronic Resource
English
TPS , risers , bundles , installation , flexibles , towing CDTM flowlines
Enhanced Flexible Riser Installation-Extending Towed Production System Technologies
British Library Online Contents | 1992
|Elsevier | 1992
|Installation aspects of flexible riser systems
Elsevier | 1989
|The Central Brae Project Retrofit Riser Installation
Springer Verlag | 1990
|Towed excavator control method and system and towed excavator
European Patent Office | 2024
|