A platform for research: civil engineering, architecture and urbanism
Distinctive winning elements in BOT tender
The Build-Operate-Transfer (BOT) model of development of privatized infrastructure projects is implemented through the award of a concession to a private sector consortium which will finance, build and operate the facility. In a competitive BOT tender, the selection of the successful consortium does not depend on the lowest tolls offered by the tenderer. Rather, it is dependent on the ability of the promoter to provide the most competitive package of distinctive winning elements in its proposal during the final negotiations. The promoter must fully understand the government's needs and concerns and be able to address them through the right package of the winning elements. In this paper, these elements are developed from sub-factors of the critical success factors of technical solution advantage, financial package differentiation and differentiation in guarantees.
Distinctive winning elements in BOT tender
The Build-Operate-Transfer (BOT) model of development of privatized infrastructure projects is implemented through the award of a concession to a private sector consortium which will finance, build and operate the facility. In a competitive BOT tender, the selection of the successful consortium does not depend on the lowest tolls offered by the tenderer. Rather, it is dependent on the ability of the promoter to provide the most competitive package of distinctive winning elements in its proposal during the final negotiations. The promoter must fully understand the government's needs and concerns and be able to address them through the right package of the winning elements. In this paper, these elements are developed from sub-factors of the critical success factors of technical solution advantage, financial package differentiation and differentiation in guarantees.
Distinctive winning elements in BOT tender
TIONG, ROBERT L.K. (author) / ALUM, JAHIDUL (author)
1997-02-01
12 pages
Article (Journal)
Electronic Resource
English
Distinctive winning elements in BOT tender
British Library Online Contents | 1997
|Distinctive winning elements in BOT tender
Online Contents | 1997
|Unique elements for distinctive designs
TIBKAT | 2009
|Probability of Winning the Tender When Proposing Using BIM Strategy: A Case Study in Saudi Arabia
DOAJ | 2021
|