A platform for research: civil engineering, architecture and urbanism
e-Tendering readiness in construction: the posterior model
The purpose of this paper is to varied a conceptual model for e-Tendering readiness in any construction organisation prior of implementing e-Tendering system.
Based on conceptual model called e-Tendering readiness model (e-TRM), this paper empirically examines the e-TRM’s interactions and causal relationships between e-Tendering constructs and e-Tendering readiness. The paper uses the structural equation modelling technique to test the hypothesised positive inter-relationships. A questionnaire survey is conducted for respondents of construction organisations in Saudi Arabia to understand their current e-Tendering readiness and importance of e-Tendering variables.
Supported by empirical evidence, this paper recognised that three out of nine constructs have direct influences on the e-Tendering readiness. However, one of the constructs, which is for the first time hypothesised and tested has the most effect.
Ultimately, the empirical test for the e-TRM is conducted in certain case (Saudi Arabia); however, the e-TRM needs to be tested in other case area for more verification.
The study findings update previous information technology/information system models in construction by adding this tested model to the research literature on traditional and electronic tendering and the body of knowledge in the construction industry.
The service providers construct is proposed and tested for the first time, which is necessary to support the successful e-Tendering implementation.
e-Tendering readiness in construction: the posterior model
The purpose of this paper is to varied a conceptual model for e-Tendering readiness in any construction organisation prior of implementing e-Tendering system.
Based on conceptual model called e-Tendering readiness model (e-TRM), this paper empirically examines the e-TRM’s interactions and causal relationships between e-Tendering constructs and e-Tendering readiness. The paper uses the structural equation modelling technique to test the hypothesised positive inter-relationships. A questionnaire survey is conducted for respondents of construction organisations in Saudi Arabia to understand their current e-Tendering readiness and importance of e-Tendering variables.
Supported by empirical evidence, this paper recognised that three out of nine constructs have direct influences on the e-Tendering readiness. However, one of the constructs, which is for the first time hypothesised and tested has the most effect.
Ultimately, the empirical test for the e-TRM is conducted in certain case (Saudi Arabia); however, the e-TRM needs to be tested in other case area for more verification.
The study findings update previous information technology/information system models in construction by adding this tested model to the research literature on traditional and electronic tendering and the body of knowledge in the construction industry.
The service providers construct is proposed and tested for the first time, which is necessary to support the successful e-Tendering implementation.
e-Tendering readiness in construction: the posterior model
Al Yahya, Moath (author) / Skitmore, Martin (author) / Bridge, Adrian (author) / Nepal, Madhav (author) / Cattell, David (author)
Construction Innovation ; 18 ; 1
2018-02-26
1 pages
Article (Journal)
Electronic Resource
English
Assessing e-tendering readiness of construction industry in Egypt : A conceptual assessment model
BASE | 2018
|The readiness of construction contractors and consultants to adopt e-tendering
Emerald Group Publishing | 2018
|Wiley | 2003
|Estimating and tendering for construction work
TIBKAT | 1984
|