Time-cost relationships of building construction project in Korea
–
Time is an important factor in any project, especially in construction projects. Although using detailed scheduling techniques is unavoidable, a model to predict or benchmark time performance has interested many researchers. For an exploratory purpose, this paper aims to investigate the time-cost relationship proposed by Bromilow with data from construction projects in Korea.
The data are collected from 34 historical building projects in Korea. Construction cost is adjusted using a building price index. Analysis is carried out on variety of project characteristics.
It is shown that a time-cost relationship is applicable to the Korean construction industry. Further analysis indicates that the original Bromilow time-cost model is not the best fit regression form, and alternative models are proposed.
The data are limited to a small sample of 34 building projects. This limitation arises because of the data collection approach, which is direct contact with historical project documents supplied by construction firms.
Models from this study can serve as a reference tool for practitioners in the early stages of building projects in Korea. The results from this study are not intended to reject or replace detailed construction scheduling techniques.
Time-cost relationships of building construction project in Korea
–
Time is an important factor in any project, especially in construction projects. Although using detailed scheduling techniques is unavoidable, a model to predict or benchmark time performance has interested many researchers. For an exploratory purpose, this paper aims to investigate the time-cost relationship proposed by Bromilow with data from construction projects in Korea.
The data are collected from 34 historical building projects in Korea. Construction cost is adjusted using a building price index. Analysis is carried out on variety of project characteristics.
It is shown that a time-cost relationship is applicable to the Korean construction industry. Further analysis indicates that the original Bromilow time-cost model is not the best fit regression form, and alternative models are proposed.
The data are limited to a small sample of 34 building projects. This limitation arises because of the data collection approach, which is direct contact with historical project documents supplied by construction firms.
Models from this study can serve as a reference tool for practitioners in the early stages of building projects in Korea. The results from this study are not intended to reject or replace detailed construction scheduling techniques.
Time-cost relationships of building construction project in Korea
Le-Hoai, Long (author) / Dai Lee, Young (author)
Facilities ; 27 ; 549-559
2009-07-03
11 pages
Article (Journal)
Electronic Resource
English
Time-cost relationships of building construction project in Korea
Online Contents | 2009
|Time-Cost Relationships in Australian Building Construction Projects
Online Contents | 2005
|Time-Cost Relationships in Australian Building Construction Projects
British Library Online Contents | 2005
|Quantitative approach for project performance measurement on building construction in South Korea
Springer Verlag | 2011
|Time and Cost Planning of a Housing Construction Project Using Building Information Modelling
BASE | 2020
|