A system dynamics approach to conceptualise causes of cost overrun of construction projects in developing countries
This study aimed at developing and empirically testing a system dynamics causal loop (SDCL) model for investigating factors related to the risk of cost overruns, associated with the performance of construction projects in developing countries.
Using data derived from the Ghanaian construction industry (GCI), a conceptual system dynamics model was hypothesised and empirically tested.
Supported by empirical evidence, the study established that the low technical capacity of consultants is the underlying cause of cost overruns in government projects. There is a strong proof of the relationship between the results of the SDCL model and poor contract planning and supervision, change orders, competence of the project team and the lack of effective coordination amongst the contractual parties.
The final SDCL model has revealed key risk components that would require standard mitigation measures in order to achieve “acceptable success” in construction projects.
The study presents an interactive approach for construction practitioners in developing countries to prioritise the causes of cost overruns in order to initiate quick responses.
A system dynamics approach to conceptualise causes of cost overrun of construction projects in developing countries
This study aimed at developing and empirically testing a system dynamics causal loop (SDCL) model for investigating factors related to the risk of cost overruns, associated with the performance of construction projects in developing countries.
Using data derived from the Ghanaian construction industry (GCI), a conceptual system dynamics model was hypothesised and empirically tested.
Supported by empirical evidence, the study established that the low technical capacity of consultants is the underlying cause of cost overruns in government projects. There is a strong proof of the relationship between the results of the SDCL model and poor contract planning and supervision, change orders, competence of the project team and the lack of effective coordination amongst the contractual parties.
The final SDCL model has revealed key risk components that would require standard mitigation measures in order to achieve “acceptable success” in construction projects.
The study presents an interactive approach for construction practitioners in developing countries to prioritise the causes of cost overruns in order to initiate quick responses.
A system dynamics approach to conceptualise causes of cost overrun of construction projects in developing countries
Cost overrun of construction projects
Asiedu, Richard Ohene (author) / Ameyaw, Collins (author)
International Journal of Building Pathology and Adaptation ; 39 ; 831-851
2020-12-30
21 pages
Article (Journal)
Electronic Resource
English
What Causes Cost Overrun in Transport Infrastructure Projects?
Online Contents | 2004
|What Causes Cost Overrun in Transport Infrastructure Projects?
Taylor & Francis Verlag | 2004
|