Determinants of rework in building construction projects
Rework represents the unnecessary effort of redoing a process or activity that is incorrectly implemented the first time. Using a structured questionnaire survey, the causes and costs of rework in 161 Australian construction projects were identified. Respondents were invited to indicate direct and indirect rework costs that would be subsequently combined to produce a total rework cost (TRC) figure. Stepwise linear multiple regression analysis was then used to determine a model that included an optimum mixture of significant variables that contributed or lead to a reduction in TRC for the projects sampled. The research revealed that rework per se can negatively influence project safety. Client initiated changes and ineffective use of information technology by the design professionals were identified as being significant variables contributing to rework occurrence. Contrary to an earlier presupposition, design scope freezing was also identified as being a significant factor that can contribute to rework.
Determinants of rework in building construction projects
Rework represents the unnecessary effort of redoing a process or activity that is incorrectly implemented the first time. Using a structured questionnaire survey, the causes and costs of rework in 161 Australian construction projects were identified. Respondents were invited to indicate direct and indirect rework costs that would be subsequently combined to produce a total rework cost (TRC) figure. Stepwise linear multiple regression analysis was then used to determine a model that included an optimum mixture of significant variables that contributed or lead to a reduction in TRC for the projects sampled. The research revealed that rework per se can negatively influence project safety. Client initiated changes and ineffective use of information technology by the design professionals were identified as being significant variables contributing to rework occurrence. Contrary to an earlier presupposition, design scope freezing was also identified as being a significant factor that can contribute to rework.
Determinants of rework in building construction projects
Love, Peter E.D. (author) / Edwards, David J. (author)
Engineering, Construction and Architectural Management ; 11 ; 259-274
2004-08-01
16 pages
Article (Journal)
Electronic Resource
English
Determinants of rework in building construction projects
Online Contents | 2004
|Impact of rework on material waste in building construction projects
Taylor & Francis Verlag | 2022
|A rework probability model: a quantitative assessment of rework occurrence in construction projects
Taylor & Francis Verlag | 2015
|