ESTIVATE: a model for calculating excavator productivity and output costs
Hydraulic excavator cycle time and associated unit costs of excavation for given input estimating data, for machines operating in the UK construction industry, are predicted. Using multiple regression analysis, three variables are identified as accurate predictors of cycle time: machine weight, digging depth and machine swing angle. With a coefficient of determination (R2) of 0.88, a mean percentage error (MPE) of −5.49, and a mean absolute error (MAPE) of 3.67, the cycle time model is robust; this is further validated using chi-square analysis and Pearson's correlation coefficient (on predicted and actual values of machine cycle time). An illustrative example of the model's application to determine machine productivity is given. The paper concludes with a spreadsheet model for calculating excavation costs (m3 and cost per h) which is able to deal with any combination of the three independent cycle time predictor variables and other estimator's input data.
ESTIVATE: a model for calculating excavator productivity and output costs
Hydraulic excavator cycle time and associated unit costs of excavation for given input estimating data, for machines operating in the UK construction industry, are predicted. Using multiple regression analysis, three variables are identified as accurate predictors of cycle time: machine weight, digging depth and machine swing angle. With a coefficient of determination (R2) of 0.88, a mean percentage error (MPE) of −5.49, and a mean absolute error (MAPE) of 3.67, the cycle time model is robust; this is further validated using chi-square analysis and Pearson's correlation coefficient (on predicted and actual values of machine cycle time). An illustrative example of the model's application to determine machine productivity is given. The paper concludes with a spreadsheet model for calculating excavation costs (m3 and cost per h) which is able to deal with any combination of the three independent cycle time predictor variables and other estimator's input data.
ESTIVATE: a model for calculating excavator productivity and output costs
EDWARDS, DAVID J. (author) / HOLT, GARY D. (author)
2000-01-01
11 pages
Article (Journal)
Electronic Resource
English
ESTIVATE: a model for calculating excavator productivity and output costs
Online Contents | 2000
|Artificial neural networks model for predicting excavator productivity
Emerald Group Publishing | 2002
|Artificial neural networks model for predicting excavator productivity
Online Contents | 2002
|EXCAVATOR, EXCAVATOR MANAGEMENT DEVICE, EXCAVATOR MANAGEMENT SYSTEM, AND EXCAVATOR ASSIST DEVICE
European Patent Office | 2021
|