A platform for research: civil engineering, architecture and urbanism
LARGE SCALE SPALLATION INDUCING ICE PROTECTION
A technique for protecting a structure from an impact with ice involves providing a horizontal spall initiator extending from the wall a distance of 1 to 10 cm, the horizontal spall initiator being resilient to the ice impact, and formed by blade segments having a blade width less than 1/2 a thickness of an expected hard zone of the ice; and situating the horizontal spall initiator at an elevation of the expected hard zone. Situating the horizontal spall initiator at an elevation of the hard zone may involve providing an elevation control mechanism (e.g. buoyancy, mechanical, or hydrodynamic), or may involve a panel with a plurality of horizontal span initiators at respective elevations. The horizontal spall initiator may be driven.
Une technique de protection dune structure contre un impact de glace comprend létablissement dun mécanisme déclatement horizontal en protrusion de 1 à 10 cm du mur, ce mécanisme étant résistant aux impacts de glace et formé par des segments de lame ayant une largeur de lame de moins de la moitié dune épaisseur dune zone dure attendue du morceau de glace, et le positionnement dudit mécanisme à une hauteur de la zone dure attendue. Positionner le mécanisme déclatement horizontal à une hauteur de la zone dure peut comprendre létablissement dun mécanisme de contrôle de la hauteur (p. ex., flottabilité, mécanique, hydrodynamisme) ou comprendre un panneau comportant une pluralité de mécanismes déclatement horizontaux à différentes hauteurs. Le mécanisme déclatement horizontal peut être commandé.
LARGE SCALE SPALLATION INDUCING ICE PROTECTION
A technique for protecting a structure from an impact with ice involves providing a horizontal spall initiator extending from the wall a distance of 1 to 10 cm, the horizontal spall initiator being resilient to the ice impact, and formed by blade segments having a blade width less than 1/2 a thickness of an expected hard zone of the ice; and situating the horizontal spall initiator at an elevation of the expected hard zone. Situating the horizontal spall initiator at an elevation of the hard zone may involve providing an elevation control mechanism (e.g. buoyancy, mechanical, or hydrodynamic), or may involve a panel with a plurality of horizontal span initiators at respective elevations. The horizontal spall initiator may be driven.
Une technique de protection dune structure contre un impact de glace comprend létablissement dun mécanisme déclatement horizontal en protrusion de 1 à 10 cm du mur, ce mécanisme étant résistant aux impacts de glace et formé par des segments de lame ayant une largeur de lame de moins de la moitié dune épaisseur dune zone dure attendue du morceau de glace, et le positionnement dudit mécanisme à une hauteur de la zone dure attendue. Positionner le mécanisme déclatement horizontal à une hauteur de la zone dure peut comprendre létablissement dun mécanisme de contrôle de la hauteur (p. ex., flottabilité, mécanique, hydrodynamisme) ou comprendre un panneau comportant une pluralité de mécanismes déclatement horizontaux à différentes hauteurs. Le mécanisme déclatement horizontal peut être commandé.
LARGE SCALE SPALLATION INDUCING ICE PROTECTION
PROTECTION CONTRE LA GLACE INDUISANT UNE SPALLATION A GRANDE ECHELLE
GAGNON ROBERT E (author)
2020-03-10
Patent
Electronic Resource
English
Emerging power technologies and oxide scale spallation
British Library Online Contents | 1995
|Modelling scale failure in tension (fracture and spallation)
British Library Online Contents | 2005
|Spallation of the Oxide Scale Formed on TiAl Alloys
British Library Online Contents | 2009
|Spallation of the Oxide Scale Formed on TiAl Alloys
British Library Online Contents | 2009
|