A platform for research: civil engineering, architecture and urbanism
PROCEDE DE MODIFICATION D'UN OUVRAGE EN SOL RENFORCE
The invention relates to a method for modifying a structure with a reinforced floor, said structure comprising: an embankment, a first facing including an outer surface defining the front surface of the structure, and at least one stabilisation element connected to the first facing and extending in a reinforced area of the embankment located to the rear of the front surface of the structure. According to the invention, the modification method includes the following steps during which: a second facing is arranged along the length of the outer surface of the first facing, the stabilisation element is disconnected from the first facing, and the stabilisation element is connected to the second facing.
Procédé de modification d'un ouvrage en sol renforcé, ledit ouvrage comprenant :un remblai, un premier parement comprenant une face extérieure définissant la face frontale de l'ouvrage, et au moins un élément de stabilisation connecté au premier parement et s 'étendant dans une zone renforcée du remblai située à l'arrière de la face frontale de l'ouvrage, le procédé de modification comprenant les étapes au cours desquelles: on dispose un deuxième parement le long de la face extérieure du premier parement, on déconnecte l'élément de stabilisation du premier parement, on connecte l'élément de stabilisation au deuxième parement.
PROCEDE DE MODIFICATION D'UN OUVRAGE EN SOL RENFORCE
The invention relates to a method for modifying a structure with a reinforced floor, said structure comprising: an embankment, a first facing including an outer surface defining the front surface of the structure, and at least one stabilisation element connected to the first facing and extending in a reinforced area of the embankment located to the rear of the front surface of the structure. According to the invention, the modification method includes the following steps during which: a second facing is arranged along the length of the outer surface of the first facing, the stabilisation element is disconnected from the first facing, and the stabilisation element is connected to the second facing.
Procédé de modification d'un ouvrage en sol renforcé, ledit ouvrage comprenant :un remblai, un premier parement comprenant une face extérieure définissant la face frontale de l'ouvrage, et au moins un élément de stabilisation connecté au premier parement et s 'étendant dans une zone renforcée du remblai située à l'arrière de la face frontale de l'ouvrage, le procédé de modification comprenant les étapes au cours desquelles: on dispose un deuxième parement le long de la face extérieure du premier parement, on déconnecte l'élément de stabilisation du premier parement, on connecte l'élément de stabilisation au deuxième parement.
PROCEDE DE MODIFICATION D'UN OUVRAGE EN SOL RENFORCE
METHOD FOR MODIFYING A STRUCTURE WITH A REINFORCED FLOOR
FREITAG NICOLAS (author)
2019-02-12
Patent
Electronic Resource
French
IPC:
E02D
FOUNDATIONS
,
Gründungen
PROCEDE DE RENFORCEMENT D'UN OUVRAGE DE CONSTRUCTION, ET OUVRAGE AINSI RENFORCE
European Patent Office | 2015
|DISPOSITIF DE LIAISON POUR UN OUVRAGE EN SOL RENFORCE, OUVRAGE ET PROCEDE ASSOCIES
European Patent Office | 2017
|European Patent Office | 2018
|European Patent Office | 2018
|