A platform for research: civil engineering, architecture and urbanism
Nuclear power plant wall hanger and construction method thereof
The invention discloses a nuclear power plant wall hanger comprising at least one unit support. Each unit support is an H-shaped frame composed of a bottom support rod extensible and adjustable in length, a top support rod extensible and adjustable in length and a connecting rod jointly; each connecting rod is connected between each bottom support rod and the corresponding top support rod and capable of adjusting the height interval between the bottom support rod and the top support rod in an extensible manner; each unit support is provided with two fixed locking pieces, the rear end of the bottom support rod and the rear end of the top support rod of each unit support are inserted into the corresponding fixed locking pieces to be locked and fixed on a wall, the front ends of the top support rods between the adjacent unit supports are connected with a cross bar, and the cross bar is capable of adjusting the transverse interval between the two unit supports in an extensible manner. Welding is omitted, abutting joint between equipment and the wall can be realized smoothly, on-site workload is reduced effectively, working efficiency is improved, and strength of embedded parts is guaranteed.
Nuclear power plant wall hanger and construction method thereof
The invention discloses a nuclear power plant wall hanger comprising at least one unit support. Each unit support is an H-shaped frame composed of a bottom support rod extensible and adjustable in length, a top support rod extensible and adjustable in length and a connecting rod jointly; each connecting rod is connected between each bottom support rod and the corresponding top support rod and capable of adjusting the height interval between the bottom support rod and the top support rod in an extensible manner; each unit support is provided with two fixed locking pieces, the rear end of the bottom support rod and the rear end of the top support rod of each unit support are inserted into the corresponding fixed locking pieces to be locked and fixed on a wall, the front ends of the top support rods between the adjacent unit supports are connected with a cross bar, and the cross bar is capable of adjusting the transverse interval between the two unit supports in an extensible manner. Welding is omitted, abutting joint between equipment and the wall can be realized smoothly, on-site workload is reduced effectively, working efficiency is improved, and strength of embedded parts is guaranteed.
Nuclear power plant wall hanger and construction method thereof
TANG GAOSHAN (author) / QIAO FENGSHENG (author) / YANG HUAIYING (author) / YUAN HONGLAN (author) / ZHAO MINGLU (author) / HE PING (author) / PENG YANBIN (author) / ZHENG QINGRONG (author) / HE XIAOJUN (author) / CAO BINGQIN (author)
2015-04-01
Patent
Electronic Resource
English
Vertical storage tank outer wall construction hanger and mounting method thereof
European Patent Office | 2021
|European Patent Office | 2016
|European Patent Office | 2017