A platform for research: civil engineering, architecture and urbanism
The invention provides a waterproofing construction method, comprising the steps: cleaning water surfaces and a basic floor layer; cleaning roots of upper and lower water pipes and plugging leaking; brushing the wall surfaces and the floor with waterproof emulsion and molding at one time; after drying for 18-24 hours, performing a closed water test; pasting floor tiles and pasting wall tiles. The time difference for brushing the wall surfaces and the floor with the waterproof emulsion is less than the drying time of the waterproof emulsion; the step of brushing the wall surfaces and the floor with waterproof emulsion and molding at one time is that the wall surfaces and the floor are brushed with the waterproof emulsion alternatively or the wall surfaces are brushed with the waterproof emulsion and then the floor is brushed with the waterproof emulsion immediately, no wall tiles are pasted at the intervals and the waterproof emulsion on the wall surfaces and the floor are brushed and molded at one time. In the waterproof construction method, the waterproofing is brushed and molded at one time, no connectors exist in the waterproofing of the wall surfaces and the floor and the water seepage of the connectors is avoided; the floor tiles are pasted and then the wall tiles are pasted; height lines can be drawn without using a blocking block, a baffle block and a level gauge; the construction difficulty is reduced and the construction time is saved.
The invention provides a waterproofing construction method, comprising the steps: cleaning water surfaces and a basic floor layer; cleaning roots of upper and lower water pipes and plugging leaking; brushing the wall surfaces and the floor with waterproof emulsion and molding at one time; after drying for 18-24 hours, performing a closed water test; pasting floor tiles and pasting wall tiles. The time difference for brushing the wall surfaces and the floor with the waterproof emulsion is less than the drying time of the waterproof emulsion; the step of brushing the wall surfaces and the floor with waterproof emulsion and molding at one time is that the wall surfaces and the floor are brushed with the waterproof emulsion alternatively or the wall surfaces are brushed with the waterproof emulsion and then the floor is brushed with the waterproof emulsion immediately, no wall tiles are pasted at the intervals and the waterproof emulsion on the wall surfaces and the floor are brushed and molded at one time. In the waterproof construction method, the waterproofing is brushed and molded at one time, no connectors exist in the waterproofing of the wall surfaces and the floor and the water seepage of the connectors is avoided; the floor tiles are pasted and then the wall tiles are pasted; height lines can be drawn without using a blocking block, a baffle block and a level gauge; the construction difficulty is reduced and the construction time is saved.
Waterproofing construction method
CUI ZHIYANG (author)
2015-04-01
Patent
Electronic Resource
English