A platform for research: civil engineering, architecture and urbanism
Double-deck concrete faced rock-fill dam and construction method thereof
The invention discloses a double-deck concrete faced rock-fill dam. The double-deck concrete faced rock-fill dam comprises a rock-fill accumulation body, a concrete face, geo-membrane and a super-polymer compound concrete face, the upper side of the rock-fill accumulation body is laterally covered with the super-polymer compound concrete face, the super-polymer compound concrete face is covered with the geo-membrane, and the geo-membrane is covered with the concrete face. The invention also discloses the double-deck concrete faced rock-fill dam construction method. According to the double-deck concrete faced rock-fill dam and the construction method thereof, the filling requirement to the accumulation body of a dam body is relatively lower, and it is avoided that a normal concrete faced rock-fill dam requires a higher degree of filling density and a loaded filter with impermeability in the process of filling; concrete hydration heat is effectively reduced, and construction links are few; the impermeability ability of the dam body is enhanced, and the loaded filter and a transition layer are not needed to be constructed on the back of concrete faces; the geo-membrane is arranged between double-deck concrete faces, and self compact concrete can be effectively protected from flowing into the accumulation body; the double-deck concrete faced rock-fill dam construction method has the advantages of being fast in construction speed, simple in process, suitable to popularize and apply and good in practicability.
Double-deck concrete faced rock-fill dam and construction method thereof
The invention discloses a double-deck concrete faced rock-fill dam. The double-deck concrete faced rock-fill dam comprises a rock-fill accumulation body, a concrete face, geo-membrane and a super-polymer compound concrete face, the upper side of the rock-fill accumulation body is laterally covered with the super-polymer compound concrete face, the super-polymer compound concrete face is covered with the geo-membrane, and the geo-membrane is covered with the concrete face. The invention also discloses the double-deck concrete faced rock-fill dam construction method. According to the double-deck concrete faced rock-fill dam and the construction method thereof, the filling requirement to the accumulation body of a dam body is relatively lower, and it is avoided that a normal concrete faced rock-fill dam requires a higher degree of filling density and a loaded filter with impermeability in the process of filling; concrete hydration heat is effectively reduced, and construction links are few; the impermeability ability of the dam body is enhanced, and the loaded filter and a transition layer are not needed to be constructed on the back of concrete faces; the geo-membrane is arranged between double-deck concrete faces, and self compact concrete can be effectively protected from flowing into the accumulation body; the double-deck concrete faced rock-fill dam construction method has the advantages of being fast in construction speed, simple in process, suitable to popularize and apply and good in practicability.
Double-deck concrete faced rock-fill dam and construction method thereof
YANG GUI (author) / JIANG YUFENG (author) / CHEN LINGWEI (author) / HU XIN (author) / ZHENG YANPING (author)
2015-05-06
Patent
Electronic Resource
English
IPC:
E02B
HYDRAULIC ENGINEERING
,
Wasserbau
Concrete Faced Rock Fill Dams Example: Dim Dam (Antalya)
British Library Conference Proceedings | 2010
|Concrete faced rock-fill dam void deformation monitoring device and installation method thereof
European Patent Office | 2015
|Settlement behaviour of a concrete faced rock-fill dam
Online Contents | 2006
|Settlement behaviour of a concrete faced rock-fill dam
British Library Online Contents | 2006
|Montgomery dam-rock fill with asphaltic concrete deck
Engineering Index Backfile | 1958
|