A platform for research: civil engineering, architecture and urbanism
Open cut tunnel waterproof construction method
The invention relates to the field of building construction, in particular to an open cut tunnel waterproof construction method. The open cut tunnel waterproof construction method provided by the invention comprises the steps of 1) after an open cut tunnel outer formwork is removed, clearly cleaning sharp materials and sundries on concrete surfaces, flattening rough positions on the concrete surfaces and smearing exterior surfaces of lining to be flat and smooth by using cement mortar; 2) conducting open cut tunnel arch wall lining back waterproof layer construction, wherein interlayer humidity detection sensor groups are installed between layers and can communicate with an engineering control center; 3) conducting open cut tunnel inverted arch lining back waterproof layer construction, wherein interlayer humidity detection sensor groups are installed between layers and can communicate with the engineering control center. The novel open cut tunnel waterproof construction method provided by the invention has the advantages that the construction quality of the open cut tunnel construction method can be effectively improved, the construction efficiency is improved, the waterproof effect change situation can be found in time and the maintenance cost is reduced.
Open cut tunnel waterproof construction method
The invention relates to the field of building construction, in particular to an open cut tunnel waterproof construction method. The open cut tunnel waterproof construction method provided by the invention comprises the steps of 1) after an open cut tunnel outer formwork is removed, clearly cleaning sharp materials and sundries on concrete surfaces, flattening rough positions on the concrete surfaces and smearing exterior surfaces of lining to be flat and smooth by using cement mortar; 2) conducting open cut tunnel arch wall lining back waterproof layer construction, wherein interlayer humidity detection sensor groups are installed between layers and can communicate with an engineering control center; 3) conducting open cut tunnel inverted arch lining back waterproof layer construction, wherein interlayer humidity detection sensor groups are installed between layers and can communicate with the engineering control center. The novel open cut tunnel waterproof construction method provided by the invention has the advantages that the construction quality of the open cut tunnel construction method can be effectively improved, the construction efficiency is improved, the waterproof effect change situation can be found in time and the maintenance cost is reduced.
Open cut tunnel waterproof construction method
XI HAO (author) / LIANG GUOHUI (author) / ZHANG WEIJUN (author) / CAI SHENGCHEN (author) / QI XIONG (author) / ZHENG MAOSHENG (author) / ZHANG XIAOLIANG (author) / LI JUNFENG (author)
2015-05-06
Patent
Electronic Resource
English
IPC:
E02D
FOUNDATIONS
,
GrĂ¼ndungen
Open cut tunnel top plate combined type waterproof construction method
European Patent Office | 2024
|Rapid construction method for open-cut high-speed rail tunnel waterproof layer
European Patent Office | 2020
|River-crossing tunnel engineering waterproof construction method
European Patent Office | 2021
|