A platform for research: civil engineering, architecture and urbanism
Disclosed is a cement-soil mixing wall former. A first crankshaft is arranged on the front side of a first driving box, a first crankshaft pin of the first crankshaft is inserted into a first rectangular hole of a first hinging arm, and a first straight pin is hinged to the right end of the first hinging arm and fixed to the front side of a second steel pipe sleeve; a third crankshaft is arranged on the back side of the first driving box, a third crankshaft pin of the third crankshaft is inserted into a third rectangular hole of a third hinging arm, and a second straight pin is hinged to the right end of the third hinging arm and fixed to the back side of the second steel pipe sleeve; a second crankshaft is arranged on the front side of a second driving box, a second crankshaft pin of the second crankshaft is inserted into a second rectangular hole of a second hinging arm, and a first straight pin is hinged to the left end of the second hinging arm; a fourth crankshaft is arranged on the back side of the second driving box, a fourth crankshaft pin of the fourth crankshaft is inserted into a fourth rectangular hole of a fourth hinging arm, and a second straight pin is hinged to the left end of the fourth hinging arm; multiple stirring blades are arranged on the first hinging arm, multiple stirring blades are arranged on the second hinging arm, multiple stirring blades are arranged on the third hinging arm, and multiple stirring blades are arranged on the fourth hinging arm.
Disclosed is a cement-soil mixing wall former. A first crankshaft is arranged on the front side of a first driving box, a first crankshaft pin of the first crankshaft is inserted into a first rectangular hole of a first hinging arm, and a first straight pin is hinged to the right end of the first hinging arm and fixed to the front side of a second steel pipe sleeve; a third crankshaft is arranged on the back side of the first driving box, a third crankshaft pin of the third crankshaft is inserted into a third rectangular hole of a third hinging arm, and a second straight pin is hinged to the right end of the third hinging arm and fixed to the back side of the second steel pipe sleeve; a second crankshaft is arranged on the front side of a second driving box, a second crankshaft pin of the second crankshaft is inserted into a second rectangular hole of a second hinging arm, and a first straight pin is hinged to the left end of the second hinging arm; a fourth crankshaft is arranged on the back side of the second driving box, a fourth crankshaft pin of the fourth crankshaft is inserted into a fourth rectangular hole of a fourth hinging arm, and a second straight pin is hinged to the left end of the fourth hinging arm; multiple stirring blades are arranged on the first hinging arm, multiple stirring blades are arranged on the second hinging arm, multiple stirring blades are arranged on the third hinging arm, and multiple stirring blades are arranged on the fourth hinging arm.
Cement-soil mixing wall former
ZHANG YONGZHONG (author)
2015-05-13
Patent
Electronic Resource
English
IPC:
E02D
FOUNDATIONS
,
GrĂ¼ndungen
Implementation method of large-diameter cement soil mixing pile former
European Patent Office | 2015
|TCSM spray-milling integrated deep cement-soil mixing wall construction method
European Patent Office | 2021
|Cement-soil mixing pile construction system and method and cement-soil mixing pile
European Patent Office | 2023
|