A platform for research: civil engineering, architecture and urbanism
Hanging method of special-shaped reinforced concrete prefabricated column
The invention discloses a hanging method of a special-shaped reinforced concrete prefabricated column. The method comprises the steps that (1) a hanging starting point position on a special-shaped column is computed; (2) a turning hanging point position on the special-shaped column is computed; (3) sleeve pipes are buried at the hanging starting point and the turning hanging point in advance; (4) long-rod screws penetrate into the pre-buried sleeve pipes of the turning hanging point respectively; (5) special-shaped column demoulding and turning are carried out; (6) preparing before hanging of the special-shaped column is carried out; (7) hanging of the special-shaped column is carried out; (8) a special-shaped column foot is stabilized and is inserted into a cup-shaped foundation; (9) special-shaped column aligning is carried out; (10) a crowbar is used for prying a wedge, or a hammer is used for striking the wedge, so that the center line of the column body is aligned with the center line of the cup bottom; (11) crane unhooking is carried out, and the special-shaped column is placed to the cup-shaped foundation bottom; (12) the wedge on the periphery is tightly stricken; (13) special-shaped column perpendicularity correction is carried out; and (14) grouting is carried out immediately after correction is carried out. During component prefabricating, a hanging hole is reserved, and the shortcomings that hanging point sliding and component corner damage which can happen easily through a conventional binding method are overcome.
Hanging method of special-shaped reinforced concrete prefabricated column
The invention discloses a hanging method of a special-shaped reinforced concrete prefabricated column. The method comprises the steps that (1) a hanging starting point position on a special-shaped column is computed; (2) a turning hanging point position on the special-shaped column is computed; (3) sleeve pipes are buried at the hanging starting point and the turning hanging point in advance; (4) long-rod screws penetrate into the pre-buried sleeve pipes of the turning hanging point respectively; (5) special-shaped column demoulding and turning are carried out; (6) preparing before hanging of the special-shaped column is carried out; (7) hanging of the special-shaped column is carried out; (8) a special-shaped column foot is stabilized and is inserted into a cup-shaped foundation; (9) special-shaped column aligning is carried out; (10) a crowbar is used for prying a wedge, or a hammer is used for striking the wedge, so that the center line of the column body is aligned with the center line of the cup bottom; (11) crane unhooking is carried out, and the special-shaped column is placed to the cup-shaped foundation bottom; (12) the wedge on the periphery is tightly stricken; (13) special-shaped column perpendicularity correction is carried out; and (14) grouting is carried out immediately after correction is carried out. During component prefabricating, a hanging hole is reserved, and the shortcomings that hanging point sliding and component corner damage which can happen easily through a conventional binding method are overcome.
Hanging method of special-shaped reinforced concrete prefabricated column
CHEN RONGLI (author) / YAN TAO (author) / XIAO BO (author) / CAI HONGTAO (author) / GAO YI (author) / SUN HONG (author) / WANG LINGLING (author)
2015-05-13
Patent
Electronic Resource
English
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Prefabricated steel-reinforced concrete combined special-shaped energy-dissipating column
European Patent Office | 2016
|Partially prefabricated steel reinforced concrete T-shaped column with embedded column
European Patent Office | 2021
|Low-rise concrete special-shaped column prefabricated type structure
European Patent Office | 2015
|Partially prefabricated high-strength steel reinforced concrete cross-shaped column
European Patent Office | 2021
|