A platform for research: civil engineering, architecture and urbanism
The invention provides a hollow steel mesh keel inner formwork cement partition wall construction method and belongs to the field of buildings. The method comprises the steps that two steel meshes in a continuous corrugated shape are connected to form a steel mesh set, and through holes are formed in the corrugation parts of the steel meshes of the steel mesh set; a mesh plate is formed by splicing multiple steel mesh sets, and the adjacent steel mesh sets are fixedly connected through iron wires; a ceiling keel and a ground keel are arranged at the installation position of a hollow steel mesh keel inner formwork cement partition wall; the mesh plate is arranged between the ceiling keel and the ground keel, and door and window openings are reserved; water and electricity distribution pipes are arranged on the mesh plate; the mesh plate is plastered to form the wall. According to the method, the mode that each steel mesh set is formed by splicing the corresponding two steel meshes, the mesh plate is formed by splicing the steel mesh sets and arranged between the ceiling keel and the ground keel, and then the mesh plate is plastered is adopted to form the wall, and the structuring measures of additionally arranging structural columns, ring beams, lintels and the like are not needed in the construction process, so that the construction process is greatly simplified, and the construction difficulty is greatly lowered.
The invention provides a hollow steel mesh keel inner formwork cement partition wall construction method and belongs to the field of buildings. The method comprises the steps that two steel meshes in a continuous corrugated shape are connected to form a steel mesh set, and through holes are formed in the corrugation parts of the steel meshes of the steel mesh set; a mesh plate is formed by splicing multiple steel mesh sets, and the adjacent steel mesh sets are fixedly connected through iron wires; a ceiling keel and a ground keel are arranged at the installation position of a hollow steel mesh keel inner formwork cement partition wall; the mesh plate is arranged between the ceiling keel and the ground keel, and door and window openings are reserved; water and electricity distribution pipes are arranged on the mesh plate; the mesh plate is plastered to form the wall. According to the method, the mode that each steel mesh set is formed by splicing the corresponding two steel meshes, the mesh plate is formed by splicing the steel mesh sets and arranged between the ceiling keel and the ground keel, and then the mesh plate is plastered is adopted to form the wall, and the structuring measures of additionally arranging structural columns, ring beams, lintels and the like are not needed in the construction process, so that the construction process is greatly simplified, and the construction difficulty is greatly lowered.
Hollow steel mesh keel inner formwork cement partition wall construction method
CEN SHENG (author)
2015-05-20
Patent
Electronic Resource
English
IPC:
E04B
Allgemeine Baukonstruktionen
,
GENERAL BUILDING CONSTRUCTIONS
European Patent Office | 2020
|Construction method for square steel keel formwork system of reaction wall
European Patent Office | 2024
|European Patent Office | 2024
|