A platform for research: civil engineering, architecture and urbanism
Water supply and drainage integration module and water supply and drainage system of building
The invention provides a water supply and drainage integration module. The module comprises a module body and preset pipelines. The preset pipelines are fixedly arranged in the module body in advance, and a connection hose is arranged at the connection ends of the preset pipelines. Butt joint between the preset pipelines can be effectively achieved due to the fact that the connection hose is arranged at the connection ends of the preset pipelines. Thus, in the building construction process, people only need to install the water supply and drainage integration module in a preserved hole, such as an equipment pithead, of each floor, then vertical pipes between upper floors and lower floors are installed, and accordingly installation and connection of vertical pipelines in a building are finished. Compared with a traditional distribution of upper pipelines and lower pipelines of floors, the preserved holes do not need to be blocked in a cast-in-place mode, namely, site formwork erection, cast-in-place concrete, formwork removal and maintenance are not needed, and people only need to directly fix the water supply and drainage integration module into each preserved hole; besides, installation speed is very high, environment pollution is little, the number of accessories assembled on site is small, and the assembly workload is small.
Water supply and drainage integration module and water supply and drainage system of building
The invention provides a water supply and drainage integration module. The module comprises a module body and preset pipelines. The preset pipelines are fixedly arranged in the module body in advance, and a connection hose is arranged at the connection ends of the preset pipelines. Butt joint between the preset pipelines can be effectively achieved due to the fact that the connection hose is arranged at the connection ends of the preset pipelines. Thus, in the building construction process, people only need to install the water supply and drainage integration module in a preserved hole, such as an equipment pithead, of each floor, then vertical pipes between upper floors and lower floors are installed, and accordingly installation and connection of vertical pipelines in a building are finished. Compared with a traditional distribution of upper pipelines and lower pipelines of floors, the preserved holes do not need to be blocked in a cast-in-place mode, namely, site formwork erection, cast-in-place concrete, formwork removal and maintenance are not needed, and people only need to directly fix the water supply and drainage integration module into each preserved hole; besides, installation speed is very high, environment pollution is little, the number of accessories assembled on site is small, and the assembly workload is small.
Water supply and drainage integration module and water supply and drainage system of building
PENG HAIHUI (author) / CHEN DINGQIU (author) / XIE JUN (author)
2015-06-24
Patent
Electronic Resource
English
Water supply and drainage integration module and water supply and drainage system of building
European Patent Office | 2015
|Water supply and drainage integration module, water supply and drainage system and bathroom
European Patent Office | 2015
|Water supply and drainage integration module and water supply and drainage system for buildings
European Patent Office | 2015
|Water supply and drainage system of water supply and drainage integrated module and building
European Patent Office | 2015
|Water supply and drainage integrated module and water supply and drainage system of building
European Patent Office | 2020
|