A platform for research: civil engineering, architecture and urbanism
The invention discloses a method for constructing a rock cliff side slope gallery road. The method comprises the following steps: (1) erecting a temporary scaffold or arranging a steel wire net; (2) drilling holes and anchoring reinforcing steel bars; (3) casting a concrete roadbed; (4) standing handrails; (5) erecting pull rods; (6) completing the construction, and removing the scaffold. The method for constructing the rock cliff side slope gallery road has the advantages that due to the adoption of the rock cliff side slope gallery road, not only is the security problem of artificial ecological restoration constructors of rock cliff side slopes solved, but also rolling rock can be certainly prevented, and the security coefficients of roads, railways and buildings are improved; a function of retaining rock water seepage and rain is also achieved, and with the combination of side slope greening, beneficial conditions are provided for plants to grow, and ecological restoration is promoted; the method is applicable to artificial ecological restoration of rock cliff side slops around roads, railways and buildings in mountain areas.
The invention discloses a method for constructing a rock cliff side slope gallery road. The method comprises the following steps: (1) erecting a temporary scaffold or arranging a steel wire net; (2) drilling holes and anchoring reinforcing steel bars; (3) casting a concrete roadbed; (4) standing handrails; (5) erecting pull rods; (6) completing the construction, and removing the scaffold. The method for constructing the rock cliff side slope gallery road has the advantages that due to the adoption of the rock cliff side slope gallery road, not only is the security problem of artificial ecological restoration constructors of rock cliff side slopes solved, but also rolling rock can be certainly prevented, and the security coefficients of roads, railways and buildings are improved; a function of retaining rock water seepage and rain is also achieved, and with the combination of side slope greening, beneficial conditions are provided for plants to grow, and ecological restoration is promoted; the method is applicable to artificial ecological restoration of rock cliff side slops around roads, railways and buildings in mountain areas.
Method for constructing rock cliff side slope gallery road
LAN ZEMIN (author)
2015-07-22
Patent
Electronic Resource
English
IPC:
E01C
Bau von Straßen, Sportplätzen oder dgl., Decken dafür
,
CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE
/
E01F
ADDITIONAL WORK, SUCH AS EQUIPPING ROADS OR THE CONSTRUCTION OF PLATFORMS, HELICOPTER LANDING STAGES, SIGNS, SNOW FENCES, OR THE LIKE
,
Zusätzliche Baumaßnahmen, wie die Ausstattung von Straßen oder die bauliche Ausbildung von Bahnsteigen, Landeplätzen für Hubschrauber, Wegweisern, Schneezäunen oder dgl.
Dangerous rock protection structure for cliff slope toe road engineering and construction method
European Patent Office | 2020
|Cliff section tunnel side and front slope protection support erecting method
European Patent Office | 2023
|Cliff-near low-grade road curve slope section grading linear induction system
European Patent Office | 2021
|