A platform for research: civil engineering, architecture and urbanism
Construction method for combined plate staircase
The invention relates to a construction method for a combined plate staircase. The construction method comprises the following steps that: a corresponding number of steel templates with the corresponding dimensions are manufactured according to the dimension of the staircase, wherein the steel templates comprise a bottom integral steel plate (1), middle standard pedaling templates (2) with the same number as the staircase steps, an upper pedaling template (3) and a lower pedaling template (4); the bottom integral steel plate (1) is manufactured according to the dimension of the staircase; the two ends of the bottom integral steel plate are bent; the bent upper end is used for being connected with an upper platform plate, and the bent lower end is used for being connected with a lower platform plate; the length of the bent upper end is identical to the width of the upper pedaling template (3), and the length of the bent lower end is identical to the width of the lower pedaling template (4); the staircase template is installed; a hoisting ring (6) is fixed; hanging to proper positions are performed, the upper pedaling template (3) is fixed on an upper platform beam through screw bolts, and the lower pedaling template (4) is fixed on a lower platform beam through screw bolts; and concrete is cast. The construction method has the advantages that the staircase construction operation can be simple; the staircase quality is improved; and the cost is reduced.
Construction method for combined plate staircase
The invention relates to a construction method for a combined plate staircase. The construction method comprises the following steps that: a corresponding number of steel templates with the corresponding dimensions are manufactured according to the dimension of the staircase, wherein the steel templates comprise a bottom integral steel plate (1), middle standard pedaling templates (2) with the same number as the staircase steps, an upper pedaling template (3) and a lower pedaling template (4); the bottom integral steel plate (1) is manufactured according to the dimension of the staircase; the two ends of the bottom integral steel plate are bent; the bent upper end is used for being connected with an upper platform plate, and the bent lower end is used for being connected with a lower platform plate; the length of the bent upper end is identical to the width of the upper pedaling template (3), and the length of the bent lower end is identical to the width of the lower pedaling template (4); the staircase template is installed; a hoisting ring (6) is fixed; hanging to proper positions are performed, the upper pedaling template (3) is fixed on an upper platform beam through screw bolts, and the lower pedaling template (4) is fixed on a lower platform beam through screw bolts; and concrete is cast. The construction method has the advantages that the staircase construction operation can be simple; the staircase quality is improved; and the cost is reduced.
Construction method for combined plate staircase
RONG BIN (author) / LIU RUI (author) / WU LIAO (author) / RONG CHENG (author) / ZHUO XIAOLING (author)
2015-08-05
Patent
Electronic Resource
English
IPC:
E04F
FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
,
Ausbau von Bauwerken, z.B. Treppen, Fußböden
Combined temporary construction staircase used in fabricated staircase
European Patent Office | 2021
|METHOD FOR CONSTRUCTING STAIRCASE, SIDE PLATE OF STAIRCASE, TREAD OF STAIRCASE, AND STAIRCASE
European Patent Office | 2022
|METHOD FOR CONSTRUCTING STAIRCASE, SIDE PLATE OF STAIRCASE, TREAD OF STAIRCASE, AND STAIRCASE
European Patent Office | 2019
|