A platform for research: civil engineering, architecture and urbanism
Arch bridge abutment tunnel type large-angle inclined pile construction method
The invention discloses an arch bridge abutment tunnel type large-angle inclined pile construction method comprising the following steps: an inclined pile is divided into an upper step and a lower step which are separately excavated by weak blasting, the top half circle and the straight wall are 2-3m in total and are excavated first as the upper step, and the lower step begins to be excavated after the upper step is excavated 3-5m; inclined pile slag is extracted by a reciprocating circulation slag extractor, pile slag of the upper step is transshipped by the slag extractor to the bottom of the lower step and then conveyed from the bottom of the lower step to the outside of a hole, and the hole is cleaned manually; after excavation of each section of each step is completed, breast wall support is completed in time in a mode of breast wall anchoring and shotcreting support through a mortar rock bolt, a steel mesh, an I-shaped steel arch and sprayed concrete; and holing quality detection is carried out after excavation of the inclined pile is completed, and inclined pile body reinforcing bar and concrete construction is completed after the holing quality meets the design and specification requirements. By adopting the method of the invention, the project progress is accelerated, the construction cycle is shortened, the working efficiency of slag extraction is improved, and the difficulty in breast wall concrete construction is reduced.
Arch bridge abutment tunnel type large-angle inclined pile construction method
The invention discloses an arch bridge abutment tunnel type large-angle inclined pile construction method comprising the following steps: an inclined pile is divided into an upper step and a lower step which are separately excavated by weak blasting, the top half circle and the straight wall are 2-3m in total and are excavated first as the upper step, and the lower step begins to be excavated after the upper step is excavated 3-5m; inclined pile slag is extracted by a reciprocating circulation slag extractor, pile slag of the upper step is transshipped by the slag extractor to the bottom of the lower step and then conveyed from the bottom of the lower step to the outside of a hole, and the hole is cleaned manually; after excavation of each section of each step is completed, breast wall support is completed in time in a mode of breast wall anchoring and shotcreting support through a mortar rock bolt, a steel mesh, an I-shaped steel arch and sprayed concrete; and holing quality detection is carried out after excavation of the inclined pile is completed, and inclined pile body reinforcing bar and concrete construction is completed after the holing quality meets the design and specification requirements. By adopting the method of the invention, the project progress is accelerated, the construction cycle is shortened, the working efficiency of slag extraction is improved, and the difficulty in breast wall concrete construction is reduced.
Arch bridge abutment tunnel type large-angle inclined pile construction method
LIU WENBING (author) / MA HAIXIAN (author) / LUO BIN (author) / ZHANG ZHILEI (author) / ZHANG RENJIE (author) / YANG ZUBING (author)
2015-08-12
Patent
Electronic Resource
English
IPC:
E02D
FOUNDATIONS
,
GrĂ¼ndungen
Concrete arch bridge inclined pile construction technology
European Patent Office | 2024
|European Patent Office | 2024
|European Patent Office | 2023
|European Patent Office | 2024
|Bridge abutment and bridge abutment design and construction method
European Patent Office | 2021
|