A platform for research: civil engineering, architecture and urbanism
Mutually-embedded reinforced ecological retaining wall construction method
The invention relates to a mutually-embedded reinforced ecological retaining wall construction method. The mutually-embedded reinforced ecological retaining wall construction method comprises the steps of firstly removing the damaged original bank and foundation, thereafter simultaneously constructing foundation piles, digging away part of wall, filling soil, then simultaneously performing reinforced concrete foundation construction and net arrangement at the front of the wall, embedding anchor heads into the reinforced concrete foundation, performing mutually-embedded masonry construction on the reinforced concrete foundation to form a retaining wall cone, threading out diagonal tie bars from reserved holes in mutually-embedded masonries when each masonry is placed, immediately performing construction of a concrete cap after the mutually-embedded masonries reach design height, simultaneously arranging anchor heads in the concrete cap, finally anchoring the diagonal tie bars in the concrete cap to complete the vertical anchoring work of the retaining wall, simultaneously performing drainage layer and cement jet grouting pile construction, forming expand heads according to predetermined depth, performing horizontal drilling in the mutually-embedded masonry retaining wall to form anchor rod holes until the drilling depth reaches the positions of the expand heads, then inserting anchor rods in the drilled holes, and performing anchoring by grounding to complete horizontal anchor rod construction.
Mutually-embedded reinforced ecological retaining wall construction method
The invention relates to a mutually-embedded reinforced ecological retaining wall construction method. The mutually-embedded reinforced ecological retaining wall construction method comprises the steps of firstly removing the damaged original bank and foundation, thereafter simultaneously constructing foundation piles, digging away part of wall, filling soil, then simultaneously performing reinforced concrete foundation construction and net arrangement at the front of the wall, embedding anchor heads into the reinforced concrete foundation, performing mutually-embedded masonry construction on the reinforced concrete foundation to form a retaining wall cone, threading out diagonal tie bars from reserved holes in mutually-embedded masonries when each masonry is placed, immediately performing construction of a concrete cap after the mutually-embedded masonries reach design height, simultaneously arranging anchor heads in the concrete cap, finally anchoring the diagonal tie bars in the concrete cap to complete the vertical anchoring work of the retaining wall, simultaneously performing drainage layer and cement jet grouting pile construction, forming expand heads according to predetermined depth, performing horizontal drilling in the mutually-embedded masonry retaining wall to form anchor rod holes until the drilling depth reaches the positions of the expand heads, then inserting anchor rods in the drilled holes, and performing anchoring by grounding to complete horizontal anchor rod construction.
Mutually-embedded reinforced ecological retaining wall construction method
WANG XINQUAN (author)
2015-09-02
Patent
Electronic Resource
English
European Patent Office | 2015
|Self-embedded ecological building block, retaining wall and construction method of retaining wall
European Patent Office | 2020
|Embedded type ecological block retaining wall and construction method thereof
European Patent Office | 2015
|European Patent Office | 2024
|