A platform for research: civil engineering, architecture and urbanism
Movable construction platform and application method thereof
The invention discloses a movable construction platform and an application method thereof. The movable construction platform comprises a ladder and a fence detachably arranged on the top of the ladder. A center hole is formed in the center of the fence, main fulcrum bars are arranged on the two sides of a bottom plate of the fence, an auxiliary fulcrum bar is arranged between the main fulcrum bars on the two sides, and a footboard is laid on the tops of the main fulcrum bars and the top of the auxiliary fulcrum bar. A ladder through hole is formed in the footboard, and the ladder is arranged at the bottom of the ladder through hole. By means of the movable construction platform and the application method thereof, the quality and efficiency of steel structure column installing and welding can be effectively improved, and the possibility of accidents in the steel structure column installing and welding process can be effectively reduced. The working process of scaffold installing is omitted, the working efficiency is improved, and the construction period is shortened.
Movable construction platform and application method thereof
The invention discloses a movable construction platform and an application method thereof. The movable construction platform comprises a ladder and a fence detachably arranged on the top of the ladder. A center hole is formed in the center of the fence, main fulcrum bars are arranged on the two sides of a bottom plate of the fence, an auxiliary fulcrum bar is arranged between the main fulcrum bars on the two sides, and a footboard is laid on the tops of the main fulcrum bars and the top of the auxiliary fulcrum bar. A ladder through hole is formed in the footboard, and the ladder is arranged at the bottom of the ladder through hole. By means of the movable construction platform and the application method thereof, the quality and efficiency of steel structure column installing and welding can be effectively improved, and the possibility of accidents in the steel structure column installing and welding process can be effectively reduced. The working process of scaffold installing is omitted, the working efficiency is improved, and the construction period is shortened.
Movable construction platform and application method thereof
HU YUAN (author) / HU XINGWANG (author)
2015-09-02
Patent
Electronic Resource
English
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Movable working platform and construction method thereof
European Patent Office | 2021
|Movable construction platform for building construction and operation method thereof
European Patent Office | 2023
|Movable offshore oil fixing platform and construction method thereof
European Patent Office | 2021
|