Intermittent ventilation vacuum preloading foundation processing method
The invention relates to an intermittent ventilation vacuum preloading foundation processing method. The method comprises: a geotextile cushion layer and a sealing film are arranged on a soft soil surface layer or an ultra-soft soil surface layer in a laying manner; a cover cap (9) is connected to the bottom of a lower drain board; the lower drain board connected to the cover cap (9) is erected; an upper drain board, the lower drain board, a transverse drainage pipeline (1), and each ventilation pipeline (3) are connected in a sealing manner via bowknots; the transverse drainage pipe (1) and each ventilation pipeline (3) are connected in a sealing manner so that a drainage pipeline network and a ventilation pipeline network are converged, and a vent valve (8) for unified vacuum pumping and unified ventilation is installed; sealing films are arranged on surfaces of the drainage pipeline network and the ventilation pipeline network in a laying manner; and the construction of intermittent ventilation vacuum preloading is performed in a circulating manner. According to the method, the stability of the vacuum degree in the drain boards can be guaranteed and rapid and high-efficiency drainage consolidation can be performed without increasing the cost.
Intermittent ventilation vacuum preloading foundation processing method
The invention relates to an intermittent ventilation vacuum preloading foundation processing method. The method comprises: a geotextile cushion layer and a sealing film are arranged on a soft soil surface layer or an ultra-soft soil surface layer in a laying manner; a cover cap (9) is connected to the bottom of a lower drain board; the lower drain board connected to the cover cap (9) is erected; an upper drain board, the lower drain board, a transverse drainage pipeline (1), and each ventilation pipeline (3) are connected in a sealing manner via bowknots; the transverse drainage pipe (1) and each ventilation pipeline (3) are connected in a sealing manner so that a drainage pipeline network and a ventilation pipeline network are converged, and a vent valve (8) for unified vacuum pumping and unified ventilation is installed; sealing films are arranged on surfaces of the drainage pipeline network and the ventilation pipeline network in a laying manner; and the construction of intermittent ventilation vacuum preloading is performed in a circulating manner. According to the method, the stability of the vacuum degree in the drain boards can be guaranteed and rapid and high-efficiency drainage consolidation can be performed without increasing the cost.
Intermittent ventilation vacuum preloading foundation processing method
LEI HUAYANG (author) / LIU MIN (author) / ZHOU JUN (author) / WANG TIEYING (author) / WEN KAI (author)
2015-09-09
Patent
Electronic Resource
English
IPC:
E02D
FOUNDATIONS
,
GrĂ¼ndungen
Cap used for intermittent ventilation vacuum preloading drainage
European Patent Office | 2015
|Suction bucket foundation using vacuum preloading method
European Patent Office | 2017
|Pressurized vacuum preloading foundation treatment device
European Patent Office | 2023
|Vacuum combined surcharge preloading foundation treatment method
European Patent Office | 2022
|