A platform for research: civil engineering, architecture and urbanism
Intelligent high-temperature digesting station
The invention discloses an intelligent high-temperature digesting station. The intelligent high-temperature digesting station comprises a high-temperature digesting cabin and two dust-removal water tanks, wherein the two dust-removal water tanks are parallelly arranged, materials are led into the upper portion of the high-temperature digesting cabin by a control valve and a pipeline through a buffering cabin, and similarly the materials are led out of the lower portion of the high-temperature digesting cabin by the control valve and the pipeline through the buffering cabin. By means of the intelligent high-temperature digesting station, one-button type start-and-stop can be achieved, and the wanted control mode can be selected by auxiliary equipment according to needs; only the data are needed to be changed in the procedure to control the time, and the control mode is simple and practical; since only the channel located inside the digesting cabin and being connected with a dust remover is opened during water-adding digestion, the temperature and the pressure in the digesting cabin are both higher than those of the past continuous digesters; the temperature of the digesting cabin is high, then the reaction speed of quick lime can be fastened, the wetness of the finished product can be reduced, and the quality of the finished product is greatly improved.
Intelligent high-temperature digesting station
The invention discloses an intelligent high-temperature digesting station. The intelligent high-temperature digesting station comprises a high-temperature digesting cabin and two dust-removal water tanks, wherein the two dust-removal water tanks are parallelly arranged, materials are led into the upper portion of the high-temperature digesting cabin by a control valve and a pipeline through a buffering cabin, and similarly the materials are led out of the lower portion of the high-temperature digesting cabin by the control valve and the pipeline through the buffering cabin. By means of the intelligent high-temperature digesting station, one-button type start-and-stop can be achieved, and the wanted control mode can be selected by auxiliary equipment according to needs; only the data are needed to be changed in the procedure to control the time, and the control mode is simple and practical; since only the channel located inside the digesting cabin and being connected with a dust remover is opened during water-adding digestion, the temperature and the pressure in the digesting cabin are both higher than those of the past continuous digesters; the temperature of the digesting cabin is high, then the reaction speed of quick lime can be fastened, the wetness of the finished product can be reduced, and the quality of the finished product is greatly improved.
Intelligent high-temperature digesting station
LI CONGGUANG (author) / WANG FEI (author) / HU CHUN (author) / ZHOU YOUYI (author) / XU YONGFEI (author)
2015-10-21
Patent
Electronic Resource
English
IPC:
C04B
Kalk
,
LIME
Microwave heated digesting system for digesting materials to be analyzed
Elsevier | 1994
|Digesting concrete with computer
Engineering Index Backfile | 1967
|Interactions of sulphur anions and stainless steels at kraft pulp digesting temperature
British Library Online Contents | 2001
|Digesting metabolism : artificial land in Japan 1954–2202
TIBKAT | 2022
|Digesting the safety effectiveness of cable barrier systems by numbers
Elsevier | 2016
|