The invention discloses a movable scaffold and a construction process for pouring a frame building through the movable scaffold. The movable scaffold comprises a plurality of rows of longitudinal vertical pipes and horizontal transverse pipes. The transverse pipes and the vertical pipes are connected with each other at the joints to form a cuboid. The lower end of each vertical pipe is provided with a slide device. The two ends of each transverse pipe and the upper end of each vertical pipe are each provided with a telescopic connecting device. A supporting plate is arranged at the upper portion of each telescopic connecting device. The construction process of the frame building includes the following steps of pouring a shear wall and a ground at the bottom, installing a reinforcement cage on the shear wall, erecting the scaffold, erecting a formwork, pouring concrete, detaching the formwork, and transferring the scaffold to the next construction section through a traction device. The movable scaffold can be repeatedly applied at different construction sections of a box type structure after being installed once, and the transverse or longitudinal size of the scaffold can be changed according to field needs.
The invention discloses a movable scaffold and a construction process for pouring a frame building through the movable scaffold. The movable scaffold comprises a plurality of rows of longitudinal vertical pipes and horizontal transverse pipes. The transverse pipes and the vertical pipes are connected with each other at the joints to form a cuboid. The lower end of each vertical pipe is provided with a slide device. The two ends of each transverse pipe and the upper end of each vertical pipe are each provided with a telescopic connecting device. A supporting plate is arranged at the upper portion of each telescopic connecting device. The construction process of the frame building includes the following steps of pouring a shear wall and a ground at the bottom, installing a reinforcement cage on the shear wall, erecting the scaffold, erecting a formwork, pouring concrete, detaching the formwork, and transferring the scaffold to the next construction section through a traction device. The movable scaffold can be repeatedly applied at different construction sections of a box type structure after being installed once, and the transverse or longitudinal size of the scaffold can be changed according to field needs.
Movable scaffold and construction process for pouring frame building through movable scaffold
2015-10-21
Patent
Electronic Resource
English
IPC:
E04G
SCAFFOLDING
,
Baugerüste