The invention provides a discharging platform construction method, and belongs to the field of building construction equipment. The method comprises following steps: S100, manufacturing a positioning auxiliary device for an anchor ring; S200, installing the positioning auxiliary device on a casting mould before a concrete floor is casted, and enabling sleeves to be located between positioning rods and the casting mould; S300, dismounting inserted rod assemblies and the positioning rods after the concrete floor is completely casted and is solidified, and enabling the sleeves to be remained in the concrete floor; S400, inserting two fixing rods of the anchor ring into the corresponding sleeves; S500, installing I-shaped steel and enabling the I-shaped steel to be located between the two fixing rods; and S600, installing nuts on the fixing rods, screwing the nuts, and enabling the I-shaped steel to be clamped between a pedestal and the nuts. By employing the method, the positioning operation for preformed holes is simple, the construction time is saved, the precision of the preformed holes is high, and the installation for a discharging platform is facilitated.
Discharging platform construction method
The invention provides a discharging platform construction method, and belongs to the field of building construction equipment. The method comprises following steps: S100, manufacturing a positioning auxiliary device for an anchor ring; S200, installing the positioning auxiliary device on a casting mould before a concrete floor is casted, and enabling sleeves to be located between positioning rods and the casting mould; S300, dismounting inserted rod assemblies and the positioning rods after the concrete floor is completely casted and is solidified, and enabling the sleeves to be remained in the concrete floor; S400, inserting two fixing rods of the anchor ring into the corresponding sleeves; S500, installing I-shaped steel and enabling the I-shaped steel to be located between the two fixing rods; and S600, installing nuts on the fixing rods, screwing the nuts, and enabling the I-shaped steel to be clamped between a pedestal and the nuts. By employing the method, the positioning operation for preformed holes is simple, the construction time is saved, the precision of the preformed holes is high, and the installation for a discharging platform is facilitated.
Discharging platform construction method
YANG SHAOJUN (author) / LI SHUJIANG (author) / ZHOU BIN (author)
2015-10-21
Patent
Electronic Resource
English
IPC:
E04G
SCAFFOLDING
,
Baugerüste