A platform for research: civil engineering, architecture and urbanism
Distribution reservoir water level setting device, distribution reservoir water level setting method, and distribution reservoir water level setting system
A distribution reservoir water level setting device is provided with a recording unit, a simulation unit, a peak power assessment unit, and a power charge calculation unit. The recording unit records plant data and water demand data. The simulation unit calculates the amount of water sent to a distribution reservoir by a plurality of pumps on the basis of the plant data, calculates the water level of the distribution reservoir on the basis of the relationship between the amount of water sent and the water demand data, and increases or decreases the number of pumps when the water level approaches an upper or lower limit value for the distribution reservoir. The peak power assessment unit calculates a quantity of power and peak power on the basis of the amount of water sent. The power charge calculation unit calculates a power charge on the basis of the peak power and the quantity of power. The simulation unit establishes, as setting values, the upper and lower limit values for the distribution reservoir which minimize the power charge.
Distribution reservoir water level setting device, distribution reservoir water level setting method, and distribution reservoir water level setting system
A distribution reservoir water level setting device is provided with a recording unit, a simulation unit, a peak power assessment unit, and a power charge calculation unit. The recording unit records plant data and water demand data. The simulation unit calculates the amount of water sent to a distribution reservoir by a plurality of pumps on the basis of the plant data, calculates the water level of the distribution reservoir on the basis of the relationship between the amount of water sent and the water demand data, and increases or decreases the number of pumps when the water level approaches an upper or lower limit value for the distribution reservoir. The peak power assessment unit calculates a quantity of power and peak power on the basis of the amount of water sent. The power charge calculation unit calculates a power charge on the basis of the peak power and the quantity of power. The simulation unit establishes, as setting values, the upper and lower limit values for the distribution reservoir which minimize the power charge.
Distribution reservoir water level setting device, distribution reservoir water level setting method, and distribution reservoir water level setting system
YOKOKAWA KATSUYA (author) / YAMANAKA OSAMU (author) / SUGINO TOSHIHARU (author)
2015-10-28
Patent
Electronic Resource
English
IPC:
G06Q
Datenverarbeitungssysteme oder -verfahren, besonders angepasst an verwaltungstechnische, geschäftliche, finanzielle oder betriebswirtschaftliche Zwecke, sowie an geschäftsbezogene Überwachungs- oder Voraussagezwecke
,
DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES
/
E03B
Anlagen oder Verfahren zum Gewinnen, Sammeln oder Verteilen von Wasser
,
INSTALLATIONS OR METHODS FOR OBTAINING, COLLECTING, OR DISTRIBUTING WATER
/
G05B
Steuer- oder Regelsysteme allgemein
,
CONTROL OR REGULATING SYSTEMS IN GENERAL
European Patent Office | 2020
|Tap Water Recovery System For Water Distribution Reservoir
European Patent Office | 2015
Hydrodynamic modeling of distribution reservoir water quality
British Library Conference Proceedings | 1996
|