A platform for research: civil engineering, architecture and urbanism
Deep soft soil high-strength prestressed pipe pile hammer piling construction method
The invention discloses a deep soft soil high-strength prestressed pipe pile hammer piling construction method. The method comprises the steps of construction preparation, first pile in-place adjustment, piling, pile splicing, hammer storage and the like. By the adoption of a precast high-strength prestressed pipe pile, standards are unified, and the on-site drilling quality and the concrete solidification speed do not need to be considered; and accordingly, the construction speed is high, and the detection cost is low.
Deep soft soil high-strength prestressed pipe pile hammer piling construction method
The invention discloses a deep soft soil high-strength prestressed pipe pile hammer piling construction method. The method comprises the steps of construction preparation, first pile in-place adjustment, piling, pile splicing, hammer storage and the like. By the adoption of a precast high-strength prestressed pipe pile, standards are unified, and the on-site drilling quality and the concrete solidification speed do not need to be considered; and accordingly, the construction speed is high, and the detection cost is low.
Deep soft soil high-strength prestressed pipe pile hammer piling construction method
XU HONG (author) / LIU CHUANXIN (author) / WANG GANLIN (author) / XIA YAN (author)
2015-11-04
Patent
Electronic Resource
English
IPC:
E02D
FOUNDATIONS
,
Gründungen
Pipe end inner hammer piling device, assembling method and pile sinking construction method
European Patent Office | 2024
|