A platform for research: civil engineering, architecture and urbanism
Comprehensive gymnasium high formwork support system and construction method of comprehensive gymnasium high formwork support system
The invention relates to a comprehensive gymnasium high formwork support system, which comprises a beam formwork, a slab formwork and a support frame body, wherein the support frame body is a fastener type steel pipe formwork supporter and fixedly supports the beam formwork and the slab formwork. A construction method of the high formwork support system comprises the following steps of: (1) high formwork support special scheme compilation; (2) support system model selection: a support system is a fastener type steel pipe formwork supporter, and a full frame body structure form is used; (3) construction preparation; (4) measurement and paying off; (5) field frame body erection: the gap arrangement of vertical rods is uniform and reasonable, and the cross bridging is set according requirements; (6) beam slab formwork installation; (7) beam slab formwork steel bar construction; (8) beam slab concrete casting and concrete maintenance; and (9) formwork removal: the beam formwork, the slab formwork and the support frame body are removed after the cast concrete reaches the set intensity. In the construction process of the comprehensive gymnasium high formwork support system, the construction is guided through a whole set of complete scheme; the construction quality of the formwork support system is ensured; the erection engineering schedule of a gymnasium is smoothly completed; and the preset building target is achieved.
Comprehensive gymnasium high formwork support system and construction method of comprehensive gymnasium high formwork support system
The invention relates to a comprehensive gymnasium high formwork support system, which comprises a beam formwork, a slab formwork and a support frame body, wherein the support frame body is a fastener type steel pipe formwork supporter and fixedly supports the beam formwork and the slab formwork. A construction method of the high formwork support system comprises the following steps of: (1) high formwork support special scheme compilation; (2) support system model selection: a support system is a fastener type steel pipe formwork supporter, and a full frame body structure form is used; (3) construction preparation; (4) measurement and paying off; (5) field frame body erection: the gap arrangement of vertical rods is uniform and reasonable, and the cross bridging is set according requirements; (6) beam slab formwork installation; (7) beam slab formwork steel bar construction; (8) beam slab concrete casting and concrete maintenance; and (9) formwork removal: the beam formwork, the slab formwork and the support frame body are removed after the cast concrete reaches the set intensity. In the construction process of the comprehensive gymnasium high formwork support system, the construction is guided through a whole set of complete scheme; the construction quality of the formwork support system is ensured; the erection engineering schedule of a gymnasium is smoothly completed; and the preset building target is achieved.
Comprehensive gymnasium high formwork support system and construction method of comprehensive gymnasium high formwork support system
MA LIGONG (author) / LI SHUCHENG (author) / WANG QUANKUI (author) / JIANG BIN (author) / LIU KUN (author) / HU HANG (author) / XU LEI (author)
2015-11-11
Patent
Electronic Resource
English
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Comprehensive library high formwork system and construction method
European Patent Office | 2023
|METHOD OF INSTALLING A FORMWORK SUPPORT SYSTEM, FORMWORK SUPPORT PROP AND FORMWORK SUPPORT SYSTEM
European Patent Office | 2019
|Formwork support of outrigger construction formwork, construction formwork and construction method
European Patent Office | 2024
|Grouted wallboard support formwork and construction method using support formwork
European Patent Office | 2015
|Outer side formwork and formwork system for comprehensive pipe gallery construction
European Patent Office | 2024
|