A platform for research: civil engineering, architecture and urbanism
Method employing welding reinforcement cage for fixing high-strength composite pipes in cast-in-place concrete hollow beamless slab construction
The invention relates to a method employing a welding reinforcement cage for fixing high-strength composite pipes in cast-in-place concrete hollow beamless slab construction and relates to the technical field of building construction methods. The construction method comprises the following steps: step one, designing templates and a template bracket system; step two, supporting the templates; step three, placing hidden beams and thin-wall hollow pipe location lines; step four, mounting the hidden beams and slab bottom layer steel bars; step five, arranging steel bar cage pipes; step six, checking the arrangement quality of the steel bar cage pipes; step seven, fixing the steel bar cage pipes; step eight, mounting surface layer steel bars; step nine, pouring concrete; and step ten, maintaining and dismounting the templates. According to the construction method, the purposes of greatly reducing the possibility of the damage to the hollow pipes in the construction process, facilitating the fixation of the locations of the high-strength composite thin-wall hollow pipes, improving the construction quality, shortening the constriction period and reducing the cost are achieved.
Method employing welding reinforcement cage for fixing high-strength composite pipes in cast-in-place concrete hollow beamless slab construction
The invention relates to a method employing a welding reinforcement cage for fixing high-strength composite pipes in cast-in-place concrete hollow beamless slab construction and relates to the technical field of building construction methods. The construction method comprises the following steps: step one, designing templates and a template bracket system; step two, supporting the templates; step three, placing hidden beams and thin-wall hollow pipe location lines; step four, mounting the hidden beams and slab bottom layer steel bars; step five, arranging steel bar cage pipes; step six, checking the arrangement quality of the steel bar cage pipes; step seven, fixing the steel bar cage pipes; step eight, mounting surface layer steel bars; step nine, pouring concrete; and step ten, maintaining and dismounting the templates. According to the construction method, the purposes of greatly reducing the possibility of the damage to the hollow pipes in the construction process, facilitating the fixation of the locations of the high-strength composite thin-wall hollow pipes, improving the construction quality, shortening the constriction period and reducing the cost are achieved.
Method employing welding reinforcement cage for fixing high-strength composite pipes in cast-in-place concrete hollow beamless slab construction
LIN WANGJIAN (author) / WANG DONG (author) / WU GANG (author) / CHEN XIANGJIE (author) / WANG SHUILI (author) / ZHANG BIN (author) / QI LIANG (author) / CAO JIBAI (author)
2015-12-02
Patent
Electronic Resource
English
IPC:
E04B
Allgemeine Baukonstruktionen
,
GENERAL BUILDING CONSTRUCTIONS
Cast-in-place prestressed concrete sandwiched composite beamless floor slab structure
European Patent Office | 2022
|Beamless reinforced concrete ceiling construction
Engineering Index Backfile | 1914
|