A platform for research: civil engineering, architecture and urbanism
Overall resin inspection well and preparation method thereof
The invention discloses an overall resin inspection well which is prepared from, by weight, the following materials in an overall pouring mode. The overall resin inspection well comprises 80%-90% of inert particle material and 10%-20% of function resin. The overall resin inspection well has the following advantages that compared with a concrete inspection well, the overall resin inspection well is more resistant to corrosion, higher in strength and lower in weight; compared with a plastic inspection well, the rigidity is larger, the strength is higher and large-diameter inspection wells can be processed (the diameter of the plastic inspection well is generally smaller than 600 mm and the diameter of the overall resin inspection well can be processed to be equal to or larger than 3500 mm), and the axis direction and ring direction carrying capacity is large; compared with a bricked inspection well, the overall resin inspection well is more resistant to seepage and erosion by underground water, higher in strength and lower in weight. The inspection well belongs to a prefabricated inspection well and is fast in construction, capable of not being affected by the environment and particularly suitable for the region with a high underground water level.
Overall resin inspection well and preparation method thereof
The invention discloses an overall resin inspection well which is prepared from, by weight, the following materials in an overall pouring mode. The overall resin inspection well comprises 80%-90% of inert particle material and 10%-20% of function resin. The overall resin inspection well has the following advantages that compared with a concrete inspection well, the overall resin inspection well is more resistant to corrosion, higher in strength and lower in weight; compared with a plastic inspection well, the rigidity is larger, the strength is higher and large-diameter inspection wells can be processed (the diameter of the plastic inspection well is generally smaller than 600 mm and the diameter of the overall resin inspection well can be processed to be equal to or larger than 3500 mm), and the axis direction and ring direction carrying capacity is large; compared with a bricked inspection well, the overall resin inspection well is more resistant to seepage and erosion by underground water, higher in strength and lower in weight. The inspection well belongs to a prefabricated inspection well and is fast in construction, capable of not being affected by the environment and particularly suitable for the region with a high underground water level.
Overall resin inspection well and preparation method thereof
WU WENLU (author) / WANG LEI (author) / FU RUINAN (author) / GUO WENZHEN (author) / LIU YIFENG (author)
2015-12-30
Patent
Electronic Resource
English
Prefabricated resin concrete inspection well and preparation method thereof
European Patent Office | 2022
|Fabricated inspection well and preparation process thereof
European Patent Office | 2023
|Prefabricated assembly type inspection well and preparation method thereof
European Patent Office | 2024
|Wood-plastic inspection well cover and preparation method thereof
European Patent Office | 2020
|