A platform for research: civil engineering, architecture and urbanism
The invention discloses a greening combined footpath floor tile and belongs to the field of landscape greening facilities. The greening combined footpath floor tile disclosed by the invention comprises pedestrian tiles and a greening tile; the greening tile is arranged between the two pedestrian tiles; the thickness of the greening tile is less than that of each of the pedestrian tiles, and a water retaining structure extending to the outer sides of the pedestrian tiles is arranged at the joint of each pedestrian tile and the greening tile. The greening combined footpath floor tile disclosed by the invention has the advantages that accumulated water among the floor tiles is effectively utilized, and the accumulated water is effectively absorbed while splash is prevented.
The invention discloses a greening combined footpath floor tile and belongs to the field of landscape greening facilities. The greening combined footpath floor tile disclosed by the invention comprises pedestrian tiles and a greening tile; the greening tile is arranged between the two pedestrian tiles; the thickness of the greening tile is less than that of each of the pedestrian tiles, and a water retaining structure extending to the outer sides of the pedestrian tiles is arranged at the joint of each pedestrian tile and the greening tile. The greening combined footpath floor tile disclosed by the invention has the advantages that accumulated water among the floor tiles is effectively utilized, and the accumulated water is effectively absorbed while splash is prevented.
Greening combined footpath floor tile
LIU TIANYANG (author)
2015-12-30
Patent
Electronic Resource
English
IPC:
E01C
Bau von Straßen, Sportplätzen oder dgl., Decken dafür
,
CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE
Mine slope greening drainage footpath construction method
European Patent Office | 2024
|