A platform for research: civil engineering, architecture and urbanism
Prefabricated concrete column in butting connection by steel nodes
The invention discloses a prefabricated concrete column in butting connection by steel nodes. The prefabricated concrete column comprises a prefabricated concrete column body, a first steel node positioned at one end of the prefabricated concrete column body, and a second steel node positioned at the other end of the prefabricated concrete column body, wherein the first and second steel nodes are matched. As the first steel node and the second steel node are additionally arranged at the two ends of the prefabricated concrete column body, two sections of prefabricated concrete columns can be quickly matched and connected by using a principle of mutual matching of the first and second steel nodes; and then, the matched place is fixed through electric welding, so that the butting connection between the two sections of prefabricated concrete columns can be guaranteed, the traditional scene butting wet operation of prefabricated concrete columns is prevented, and the construction efficiency is quickened. The prefabricated concrete column is simple in structure and low in cost; and after the steel nodes are used for connecting, the node stress and the node ductility are improved.
Prefabricated concrete column in butting connection by steel nodes
The invention discloses a prefabricated concrete column in butting connection by steel nodes. The prefabricated concrete column comprises a prefabricated concrete column body, a first steel node positioned at one end of the prefabricated concrete column body, and a second steel node positioned at the other end of the prefabricated concrete column body, wherein the first and second steel nodes are matched. As the first steel node and the second steel node are additionally arranged at the two ends of the prefabricated concrete column body, two sections of prefabricated concrete columns can be quickly matched and connected by using a principle of mutual matching of the first and second steel nodes; and then, the matched place is fixed through electric welding, so that the butting connection between the two sections of prefabricated concrete columns can be guaranteed, the traditional scene butting wet operation of prefabricated concrete columns is prevented, and the construction efficiency is quickened. The prefabricated concrete column is simple in structure and low in cost; and after the steel nodes are used for connecting, the node stress and the node ductility are improved.
Prefabricated concrete column in butting connection by steel nodes
WU XINZHI (author) / CHEN XIAOMING (author) / XIA LIANGFENG (author) / JIA BAORONG (author) / SHENG LINFENG (author) / MENG FANQUAN (author) / LUO WEILING (author) / ZHENG XIANGJIE (author) / WU XIAOFENG (author) / XU JIALE (author)
2016-01-13
Patent
Electronic Resource
English
Prefabricated Concrete Frame Beam-Column Connection Joint With Steel Strands Anchored
European Patent Office | 2020
|Auxiliary precise butting equipment for butting assembled building
European Patent Office | 2021
|