A platform for research: civil engineering, architecture and urbanism
Guarantee method of unobstructed main road during highway reconstruction and expansion construction period
The invention discloses a guarantee method of an unobstructed main road during the highway reconstruction and expansion construction period. The method comprises the steps of continuously establishing three temporary openings at one part of a medial strip; dividing the incoming lanes and the leaving lanes on the two sides of the medial strip of a highway to be reconstructed and expanded into construction sections with alternate A roadbed sections and B roadbed sections which have different lengths; after the early construction from the A roadbed sections to the lower surface layer of the road surface is over, driving the cars into the B roadbed sections through the temporary openings of the medial strip; and changing the passed temporary opening positions according to the construction progress, so as to create a working face for alternate construction of the A roadbed sections and the B roadbed sections to further achieve whole time unobstructed bi-directional four lanes. The method is clear in engineering significance and easy to operate, and can be used for guaranteeing the main bi-directional four lanes to be unobstructed during the construction period of reconstructing and expanding a bi-directional four-lane highway into a highway with eight or more bi-directional lanes.
Guarantee method of unobstructed main road during highway reconstruction and expansion construction period
The invention discloses a guarantee method of an unobstructed main road during the highway reconstruction and expansion construction period. The method comprises the steps of continuously establishing three temporary openings at one part of a medial strip; dividing the incoming lanes and the leaving lanes on the two sides of the medial strip of a highway to be reconstructed and expanded into construction sections with alternate A roadbed sections and B roadbed sections which have different lengths; after the early construction from the A roadbed sections to the lower surface layer of the road surface is over, driving the cars into the B roadbed sections through the temporary openings of the medial strip; and changing the passed temporary opening positions according to the construction progress, so as to create a working face for alternate construction of the A roadbed sections and the B roadbed sections to further achieve whole time unobstructed bi-directional four lanes. The method is clear in engineering significance and easy to operate, and can be used for guaranteeing the main bi-directional four lanes to be unobstructed during the construction period of reconstructing and expanding a bi-directional four-lane highway into a highway with eight or more bi-directional lanes.
Guarantee method of unobstructed main road during highway reconstruction and expansion construction period
GUO BAOLIN (author) / SUN RISHUANG (author) / PAN XIFENG (author) / SONG YAWEI (author) / ZHANG XI (author) / LI WENJING (author)
2016-02-03
Patent
Electronic Resource
English
IPC:
E01C
Bau von Straßen, Sportplätzen oder dgl., Decken dafür
,
CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE
Road surface drainage device in construction period of highway reconstruction and extension project
European Patent Office | 2024
|