A platform for research: civil engineering, architecture and urbanism
Temporary grouting gallery and construction method thereof
The invention relates to the technical field of hydraulic and hydro-power engineering, in particular to a temporary grouting gallery and a construction method thereof. The temporary grouting gallery comprises a foundation surface and a replacement body. Replacement excavation space is arranged below the foundation surface of a dam and stretches to the geological flaw and influence zone of a riverbed portion, a grouting gallery body is reserved in the replacement excavation space, and the replacement body is poured into the replacement excavation space and outside the grouting gallery body. The temporary grouting gallery is arranged on the geological flaw portion and influence zone below the foundation surface, the contradiction between the construction period and geological flaw treatment is effectively avoided, and the linear construction period of a project is greatly shortened. The temporary grouting gallery of the structure is simple in structure and high in operability and reliability.
Temporary grouting gallery and construction method thereof
The invention relates to the technical field of hydraulic and hydro-power engineering, in particular to a temporary grouting gallery and a construction method thereof. The temporary grouting gallery comprises a foundation surface and a replacement body. Replacement excavation space is arranged below the foundation surface of a dam and stretches to the geological flaw and influence zone of a riverbed portion, a grouting gallery body is reserved in the replacement excavation space, and the replacement body is poured into the replacement excavation space and outside the grouting gallery body. The temporary grouting gallery is arranged on the geological flaw portion and influence zone below the foundation surface, the contradiction between the construction period and geological flaw treatment is effectively avoided, and the linear construction period of a project is greatly shortened. The temporary grouting gallery of the structure is simple in structure and high in operability and reliability.
Temporary grouting gallery and construction method thereof
TANG HU (author) / WANG RENKUN (author) / ZHOU ZHONG (author) / RAO HONGLING (author) / PAN XIAOHONG (author) / TANG ZHONGMIN (author)
2016-02-03
Patent
Electronic Resource
English
IPC:
E02D
FOUNDATIONS
,
GrĂ¼ndungen
River gallery nutrient temporary storage area and construction method thereof
European Patent Office | 2024
|European Patent Office | 2021
|Temporary trestle construction method for breakwater pipe gallery channel construction
European Patent Office | 2024
|Temporary cable hook structure in pipe gallery cabin, and construction method thereof
European Patent Office | 2020
|Salinized soil area pipe gallery backfill construction method based on microbial grouting
European Patent Office | 2023
|