A platform for research: civil engineering, architecture and urbanism
Scaffold outward projecting net dismounting method
The invention provides a scaffold outward projecting net dismounting method. The scaffold outward projecting net dismounting method comprises the following steps: providing a tower crane and a lifting hook; lifting the lifting hook to the position of a transverse rod connected to the outer side of the outward projecting net by using the tower crane; providing a pull rod which comprises an operating end and a hooking end with a hook; operating the hook until the hook is hooked to the lifting hook by using the operating end; hooking the lifting hook to the transverse rod; unfastening a fastener through which an inclined strut on the lower side of the outward projecting net is connected with a scaffold and the outward projecting net connected with the scaffold; and hoisting the outward projecting net to the ground through the tower crane connected with the lifting hook. The problem that accidents can be caused when operators require to walk from the inner side of the scaffold to the outer side of the outward projecting net so as to dismount the outward projecting net is solved.
Scaffold outward projecting net dismounting method
The invention provides a scaffold outward projecting net dismounting method. The scaffold outward projecting net dismounting method comprises the following steps: providing a tower crane and a lifting hook; lifting the lifting hook to the position of a transverse rod connected to the outer side of the outward projecting net by using the tower crane; providing a pull rod which comprises an operating end and a hooking end with a hook; operating the hook until the hook is hooked to the lifting hook by using the operating end; hooking the lifting hook to the transverse rod; unfastening a fastener through which an inclined strut on the lower side of the outward projecting net is connected with a scaffold and the outward projecting net connected with the scaffold; and hoisting the outward projecting net to the ground through the tower crane connected with the lifting hook. The problem that accidents can be caused when operators require to walk from the inner side of the scaffold to the outer side of the outward projecting net so as to dismount the outward projecting net is solved.
Scaffold outward projecting net dismounting method
MA MENG (author) / CHE HAIBAO (author) / ZHU DIANKUI (author)
2016-02-03
Patent
Electronic Resource
English
IPC:
E04G
SCAFFOLDING
,
Baugerüste