A platform for research: civil engineering, architecture and urbanism
Construction method of super-high-rise core tube wall concrete structure
The invention relates to a construction method of a super-high-rise core tube wall concrete structure. The construction method comprises the following steps: carrying out layered construction on a core tube wall from bottom to top; scattering stone in formworks of a lower-layer structure of the core tube wall when the lower-layer structure of the core tube wall is constructed and concrete is poured to a position which is distant from a set elevation by a set distance; vibrating the outsides of the formworks of the lower-layer structure of the core barrel wall so as to enable the stones to sink; forming an irregular connecting surface on a concrete pouring surface by the stones after final set of the poured concrete and constructing an upper-layer structure of the core barrel wall on the connecting surface; and repeating in such a way until construction of the core barrel wall structure is finished. The stones are scattered on the pouring surface of the lower-layer structure of the core barrel wall, the outsides of the formworks are vibrated to enable the stones to sink properly, the problem that manual laitance chiseling is difficult to control is solved effectively, and construction time is short.
Construction method of super-high-rise core tube wall concrete structure
The invention relates to a construction method of a super-high-rise core tube wall concrete structure. The construction method comprises the following steps: carrying out layered construction on a core tube wall from bottom to top; scattering stone in formworks of a lower-layer structure of the core tube wall when the lower-layer structure of the core tube wall is constructed and concrete is poured to a position which is distant from a set elevation by a set distance; vibrating the outsides of the formworks of the lower-layer structure of the core barrel wall so as to enable the stones to sink; forming an irregular connecting surface on a concrete pouring surface by the stones after final set of the poured concrete and constructing an upper-layer structure of the core barrel wall on the connecting surface; and repeating in such a way until construction of the core barrel wall structure is finished. The stones are scattered on the pouring surface of the lower-layer structure of the core barrel wall, the outsides of the formworks are vibrated to enable the stones to sink properly, the problem that manual laitance chiseling is difficult to control is solved effectively, and construction time is short.
Construction method of super-high-rise core tube wall concrete structure
YU HAISHEN (author) / PEI HONGBIN (author) / KE ZIPING (author)
2016-02-03
Patent
Electronic Resource
English
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Super high-rise building large-fall core tube concrete pouring construction method
European Patent Office | 2020
|Construction method for building core tube inclined wall of super high-rise building
European Patent Office | 2022
|Hanging frame system for super high-rise core tube inclined wall construction
European Patent Office | 2024
|Construction method of super high-rise core tube tapered variable cross-section shear wall
European Patent Office | 2021
|Maintenance method for frame core tube composite structure super high-rise shear wall
European Patent Office | 2023
|